System and method for capacity management and trading
    1.
    发明申请
    System and method for capacity management and trading 审中-公开
    能力管理和交易的制度和方法

    公开(公告)号:US20050149412A1

    公开(公告)日:2005-07-07

    申请号:US10750751

    申请日:2004-01-02

    CPC classification number: G06Q10/06 G06Q10/087

    Abstract: A system and method for capacity management and trading. The system includes at least a first capacity reserved for a first device design in a first capacity management cycle, a second capacity reserved for a second device design having a pull-in demand in a second capacity management cycle after the first capacity management cycle and a processing unit. The processing unit exchanges the first capacity and the second capacity, such that the first capacity meets the second device design and the second capacity meets the first device design.

    Abstract translation: 一种能力管理和交易的系统和方法。 所述系统包括在第一容量管理周期中为第一设备设计预留的至少第一容量,在第一容量管理周期之后在第二容量管理周期中具有拉入需求的第二设备设计预留的第二容量,以及 处理单元。 处理单元交换第一容量和第二容量,使得第一容量满足第二装置设计,第二容量满足第一装置设计。

    System and method for exception management
    2.
    发明授权
    System and method for exception management 有权
    用于异常管理的系统和方法

    公开(公告)号:US07181305B2

    公开(公告)日:2007-02-20

    申请号:US10844085

    申请日:2004-05-12

    Abstract: A system for exception management. The system comprises an input/output mechanism, a back-end server, and a management server. The input/output mechanism is configured to interface with a user and receive a requirement to suspend a progressing production. The back-end server provides online service according to the requirement. The management server estimates the impact of the required suspension on the production progress according to the requirement and a preset schedule of the production run.

    Abstract translation: 用于异常管理的系统。 该系统包括输入/​​输出机构,后端服务器和管理服务器。 输入/输出机制被配置为与用户接口并接收暂停进行生产的要求。 后端服务器根据需要提供在线服务。 管理服务器根据要求和生产运行的预设时间表,估计所需暂停对生产进度的影响。

    System and method for capacity management
    3.
    发明申请
    System and method for capacity management 审中-公开
    容量管理系统和方法

    公开(公告)号:US20050203788A1

    公开(公告)日:2005-09-15

    申请号:US10797213

    申请日:2004-03-10

    CPC classification number: G06Q10/06 G06Q10/0631

    Abstract: A system and method for capacity management. The system includes at least an order management module and a pull-in engine. The order management module receives at least a first order having a period delivery demand directing a supplier to deliver products corresponding to the order before the end of the period. The pull-in engine pushes out the first order, and directs capacity reserved for the first order to meet a second order with a pull-in demand or if a production event occurs.

    Abstract translation: 一种容量管理的系统和方法。 该系统至少包括订单管理模块和引入引擎。 订单管理模块至少接收具有期限交货需求的第一订单,指示供应商在期间结束之前交付与订单对应的产品。 引入引擎推出第一个订单,并指定第一个订单的预留容量,以满足第二个订单的拉入需求或生产事件发生。

    Method and system of data management
    4.
    发明申请
    Method and system of data management 审中-公开
    数据管理方法和系统

    公开(公告)号:US20050065960A1

    公开(公告)日:2005-03-24

    申请号:US10666503

    申请日:2003-09-19

    CPC classification number: G06F16/2365

    Abstract: A system of data management. The system includes a data verification module, a data notation module, and a data management module. The data verification module verifies the data records according to the data correlations and produces verification results, each of which corresponds to a data record. The data notation module notes the verification results in the corresponding data records. The data management module manages the data records according to the verification results.

    Abstract translation: 数据管理系统。 该系统包括数据验证模块,数据记数模块和数据管理模块。 数据验证模块根据数据相关性验证数据记录,并产生验证结果,每个验证结果对应于数据记录。 数据符号模块记录相应数据记录中的验证结果。 数据管理模块根据验证结果管理数据记录。

    System and method of reserving capacity for a pre-process order
    5.
    发明授权
    System and method of reserving capacity for a pre-process order 失效
    预处理订单的预留能力的系统和方法

    公开(公告)号:US07003365B1

    公开(公告)日:2006-02-21

    申请号:US11001769

    申请日:2004-12-02

    CPC classification number: G06Q10/06

    Abstract: In a foundry that produces a product family a system and method of reserving capacity for a pre-process order includes a plurality of products, a common pre-process operation and a plurality of distinct post-process operations corresponding to the products. When a pre-process order related to the pre-process operation from a customer is received, pre-process capacity and post-process operating capacity are reserved according to the pre-process order, and the pre-process capacity is provided for the pre-process. When a post-process order for a product corresponding to a specific post-process operation in the product family is received before a cutoff date, the reserved post-process operating capacity is provided for the corresponding post-process operation. If no post-process order is received before the cutoff date, the reserved post-process operating capacity is released as remnant supply. Other systems and methods are also provided.

    Abstract translation: 在生产产品系列的铸造厂中,为预处理订单预留容量的系统和方法包括多个产品,共同的预处理操作和对应于产品的多个不同的后处理操作。 当接收到与客户的预处理操作相关的预处理订单时,根据预处理顺序保留预处理能力和后处理操作容量,并为预处理提供预处理能力 -处理。 当在截止日期之前收到与产品系列中的特定后处理操作相对应的产品的后处理订单时,为相应的后处理操作提供保留的后处理操作容量。 如果在截止日期之前没有收到后处理订单,则保留的后处理操作容量作为剩余供应被释放。 还提供了其他系统和方法。

    System and method for pull-in order planning and control
    6.
    发明授权
    System and method for pull-in order planning and control 失效
    牵制订单计划和控制的系统和方法

    公开(公告)号:US06920365B2

    公开(公告)日:2005-07-19

    申请号:US10740258

    申请日:2003-12-18

    CPC classification number: G06Q10/06

    Abstract: A system for planning and controlling a pull-in request of an order with demanded capacity in a production system. A plan engine is programmed to receive a pull-in request for the order, release original demanded capacity, reserve a capacity for the pull-in order, and generate a fixed production schedule for the pull-in order based on a capacity model that considers a plurality of capacity vectors in the production system. A production schedule monitor and evaluation module determines whether the relevant current pull-in order conforms to the fixed production schedule and whether to adjust the fixed production schedule when the relevant current pull-in order deviates from the fixed production schedule.

    Abstract translation: 一种用于规划和控制生产系统中具有需求能力的订单的拉入请求的系统。 计划引擎被编程为接收订单的拉入请求,释放原始请求的容量,为拉入订单预留容量,并且基于考虑的容量模型生成用于拉入订单的固定生产计划 生产系统中的多个容量向量。 生产进度监视和评估模块确定相关的当前引入顺序是否符合固定生产计划,以及当相关的当前引入顺序偏离固定生产计划时是否调整固定生产计划。

    System and method for multi-project wafer shuttle service
    7.
    发明申请
    System and method for multi-project wafer shuttle service 失效
    多项目晶圆穿梭服务的系统和方法

    公开(公告)号:US20050149899A1

    公开(公告)日:2005-07-07

    申请号:US10750750

    申请日:2004-01-02

    CPC classification number: G06F17/50 G03F7/70425 G03F7/70433 G06F2217/84

    Abstract: A system and method for MPW shuttle service. The system includes at least a first MPW shuttle reserving for a first group of device designs, a second MPW shuttle reserving for a second group of device designs, and a checking unit. The checking unit determines whether mask data for the first group has been provided by a cut off date for the first MPW shuttle, and exchanges a first target device design from the first group with a second target device design from the second group if the mask data of the first target device design has not been provided and that of the second target device design has been provided by the cut off date.

    Abstract translation: 一种用于MPW穿梭服务的系统和方法。 该系统包括至少保留用于第一组设备设计的第一MPW梭,为第二组设备设计保留的第二MPW梭,以及检查单元。 检查单元确定是否已经为第一MPW穿梭机的截止日期提供了第一组的掩模数据,并且如果掩模数据,则从第一组与第二组的第二目标设备设计交换第一目标设备设计 的第一个目标设备设计尚未提供,第二个目标设备设计的截止日期已经提供。

    Demand dispatch system and method
    8.
    发明申请
    Demand dispatch system and method 有权
    需求调度系统和方法

    公开(公告)号:US20050043981A1

    公开(公告)日:2005-02-24

    申请号:US10646179

    申请日:2003-08-22

    Abstract: A demand dispatch system to provide stable fabrication loading. The system includes a risk database recording risk information for a demand and an allocation planning module. The allocation planning module receives the demand, divides the demand into a low risk demand and a high risk demand according to the risk information, and then determines an expected quantity for a fabrication. The allocation planning module dispatches parts of the low risk demand and the high risk demand to the fabrication according to the expected quantity and the risk information.

    Abstract translation: 一个需求调度系统,提供稳定的制造负荷。 该系统包括记录需求和分配计划模块的风险信息的风险数据库。 分配规划模块接收需求,根据风险信息将需求分为低风险需求和高风险需求,然后确定制造的预期数量。 分配规划模块根据预期数量和风险信息调度部分低风险需求和高风险需求。

    System and method for manufacturing planning and control
    9.
    发明授权
    System and method for manufacturing planning and control 有权
    制造规划和控制的制度和方法

    公开(公告)号:US07130707B2

    公开(公告)日:2006-10-31

    申请号:US10739843

    申请日:2003-12-18

    CPC classification number: G06Q10/00 G05B19/41865 G05B2219/32086 Y02P90/20

    Abstract: A customer-orientated manufacturing planning and controlling system. An order management module is programmed to receive an order for a product and reserve a capacity for the order based on a capacity model that considers a plurality of capacity vectors in a production system. A plan engine generates a fixed production schedule for the order based on the capacity model. A priority management engine provides a priority for the order. A production schedule monitor and evaluation module determines whether the order in process conforms to the fixed production schedule by statistical process control (SPC) and whether to adjust the fixed production schedule and to adjust the priority based on a dynamic achievement model of historical fixed production schedules, based on historical production information in a production database storing production information of the production system.

    Abstract translation: 以客户为导向的制造规划和控制系统。 订单管理模块被编程为接收产品的订单并且基于在生产系统中考虑多个容量向量的容量模型来保留订单的容量。 计划引擎根据容量模型生成订单的固定生产计划。 优先级管理引擎为订单提供优先级。 生产进度监视和评估模块通过统计过程控制(SPC)确定进程中的订单是否符合固定生产计划,以及是否根据历史固定生产计划的动态成果模型调整固定生产计划并调整优先级 基于存储生产系统生产信息的生产数据库中的历史生产信息。

    System and method for multi-project wafer shuttle service
    10.
    发明授权
    System and method for multi-project wafer shuttle service 失效
    多项目晶圆穿梭服务的系统和方法

    公开(公告)号:US07073160B2

    公开(公告)日:2006-07-04

    申请号:US10750750

    申请日:2004-01-02

    CPC classification number: G06F17/50 G03F7/70425 G03F7/70433 G06F2217/84

    Abstract: A system and method for MPW shuttle service. The system includes at least a first MPW shuttle reserving for a first group of device designs, a second MPW shuttle reserving for a second group of device designs, and a checking unit. The checking unit determines whether mask data for the first group has been provided by a cut off date for the first MPW shuttle, and exchanges a first target device design from the first group with a second target device design from the second group if the mask data of the first target device design has not been provided and that of the second target device design has been provided by the cut off date.

    Abstract translation: 一种用于MPW穿梭服务的系统和方法。 该系统包括至少保留用于第一组设备设计的第一MPW梭,为第二组设备设计保留的第二MPW梭,以及检查单元。 检查单元确定是否已经为第一MPW穿梭机的截止日期提供了第一组的掩模数据,并且如果掩模数据,则从第一组与第二组的第二目标设备设计交换第一目标设备设计 的第一个目标设备设计尚未提供,第二个目标设备设计的截止日期已经提供。