Rental estimation method
    1.
    发明申请
    Rental estimation method 审中-公开
    租赁估算方法

    公开(公告)号:US20060059002A1

    公开(公告)日:2006-03-16

    申请号:US10534410

    申请日:2003-11-05

    IPC分类号: G06Q99/00

    CPC分类号: G06Q30/02 G06Q30/0645

    摘要: In a rental estimation method according to the present invention, rental information with regard to rental devices is provided to a customer through a data exchange between a terminal (9) of the customer and a management server (5) of a rental company. The rental estimation method includes a data input step for entering work content data indicating a work content through the customer terminal (9), and a necessary device reporting step for reading out a list of a plurality of necessary devices matching the work content and rental information corresponding to the necessary devices from a predefined database (2 to 4) and for providing them to the customer.

    摘要翻译: 在根据本发明的租赁估计方法中,通过客户的终端(9)和租赁公司的管理服务器(5)之间的数据交换,向客户提供关于租赁设备的租赁信息。 租赁估计方法包括:数据输入步骤,用于输入通过客户终端(9)指示工作内容的工作内容数据;以及必要的设备报告步骤,用于读出与工作内容和租赁信息相匹配的多个必需设备的列表 对应于来自预定义数据库(2至​​4)的必要设备并将其提供给客户。

    Method for managing construction machine, and arithmetic processing apparatus
    10.
    发明授权
    Method for managing construction machine, and arithmetic processing apparatus 有权
    施工机械管理方法及运算处理装置

    公开(公告)号:US06832175B2

    公开(公告)日:2004-12-14

    申请号:US10240117

    申请日:2002-09-27

    IPC分类号: G04F100

    CPC分类号: E02F9/20 G07C5/008 G07C5/085

    摘要: A hydraulic excavator 1 working in fields includes a controller 2 for measuring a working time for each of an engine 32, a front 15, a swing body 13, and a travel body 12, storing measured data in a memory of the controller 2, and then transferring it to a base station computer 3 via satellite communication, an FD, etc. The transferred data is stored as a database 100 in the base station computer 3. The base station computer 3 reads the data stored in the database 100 for each hydraulic excavator, calculates a working time of a part belonging to each section on the basis of the working time of that section, and compares the calculated working time with a preset target replacement time interval of the relevant part, thereby calculating a remaining time up to next replacement of the relevant part and managing the scheduled replacement timing thereof. Thus, the appropriate scheduled replacement timing of parts can be determined even in a construction machine having a plurality of sections that differ in working time from each other.

    摘要翻译: 在田间工作的液压挖掘机1包括控制器2,用于测量发动机32,前15,摆动体13和行驶体12的工作时间,将测量数据存储在控制器2的存储器中,以及 然后通过卫星通信,FD等将其传送到基站计算机3.将传送的数据作为数据库100存储在基站计算机3中。基站计算机3读取存储在数据库100中的每个液压的数据 挖掘机根据该部分的工作时间计算属于每个部分的部分的工作时间,并将计算出的工作时间与相关部分的预设目标更换时间间隔进行比较,从而计算直至下一个的剩余时间 更换相关部件并管理其定时更换时间。 因此,即使在具有彼此不同的工作时间的多个部分的建筑机械中,也可以确定部件的适当的计划更换定时。