摘要:
In a rental estimation method according to the present invention, rental information with regard to rental devices is provided to a customer through a data exchange between a terminal (9) of the customer and a management server (5) of a rental company. The rental estimation method includes a data input step for entering work content data indicating a work content through the customer terminal (9), and a necessary device reporting step for reading out a list of a plurality of necessary devices matching the work content and rental information corresponding to the necessary devices from a predefined database (2 to 4) and for providing them to the customer.
摘要:
A method and system for managing a construction machine whereby working time for each of different parts of a hydraulic excavator is measured. Measured data is stored in a memory of a controller and then transferred to a base station computer via satellite communication to be stored in a database. At each repair/replacement of a part in each hydraulic excavator, the base station computer calculates, based on the operation data, a replacement time interval of the part on the basis of the working time per section to which the part belongs, and then stores and accumulates it. The base station computer also reads the stored data for each hydraulic excavator, determines, for each part, a replacement rate of the part having a substantially equal replacement time interval, and calculates a target replacement time interval of the part in accordance with the replacement time interval corresponding to a maximum replacement rate.
摘要:
A security system of a construction machine of the present invention has a construction machine, a base station and a communication device. The construction machine comprises a data sending and receiving portion for sending first information, a storage portion for storing received information, and a control portion for controlling an operation of the construction machine. The base station receives the first information from the data sending and receiving portion of the construction machine and sends second information to the construction machine and manages the construction machine. It is configured so that the communication device is connected to the base station through a communication network and can send third information to the construction machine through the base station.
摘要:
Assessment information needed to calculate a used vehicle assessment value of a hydraulic excavator 10 is input to a portable telephone 20 and is then transmitted from the portable telephone 20. The transmitted assessment information is received at a manufacturer's base station 40 at a remote location. The used vehicle assessment value of the hydraulic excavator 10 is calculated based upon the received assessment information, and history information and operation information on the hydraulic excavator 10 read out from an operation information database 43 and a history database 42 in correspondence to an ID number assigned to the hydraulic excavator which is included in the assessment information.
摘要:
Assessment information needed to calculate a used vehicle assessment value of a hydraulic excavator 10 is input to a portable telephone 20 and is then transmitted from the portable telephone 20. The transmitted assessment information is received at a manufacturer's base station 40 at a remote location. The used vehicle assessment value of the hydraulic excavator 10 is calculated based upon the received assessment information, and history information and operation information on the hydraulic excavator 10 read out from an operation information database 43 and a history database 42 in correspondence to an ID number assigned to the hydraulic excavator which is included in the assessment information.
摘要:
A security system for a construction machine including a construction machine equipped with a body controller for storing a first password, management apparatus arranged in a location apart from the construction machine and a portable communications unit for storing a second password provided communicably with the management apparatus and the body controller. The portable communications unit, receiving the first password from the management apparatus, replaces the second password with the first password. The body controller determines whether the second password output from the portable communications unit coincides with the first password. In case these passwords coincide with each other, an engine drive signal is output. Otherwise the engine is kept inoperable. This prevents possible theft of a construction machine.
摘要:
Assessment information needed to calculate a used vehicle assessment value of a hydraulic excavator 10 is input to a portable telephone 20 and is then transmitted from the portable telephone 20. The transmitted assessment information is received at a manufacturer's base station 40 at a remote location. The used vehicle assessment value of the hydraulic excavator 10 is calculated based upon the received assessment information, and history information and operation information on the hydraulic excavator 10 read out from an operation information database 43 and a history database 42 in correspondence to an ID number assigned to the hydraulic excavator which is included in the assessment information.
摘要:
A method for outputting failure handling method includes: detecting conditions of each part of a working machine; transmitting condition signals representing the detected conditions; receiving the condition signals; calculating a handling method for a failure showed by the received condition signals; and transmitting a handling signal representing the calculated handling method.
摘要:
A hydraulic excavator 1 working in fields includes a controller 2 for measuring a working time for each of an engine 32, a front 15, a swing body 13, and a travel body 12, storing measured data in a memory of the controller 2, and then transferring it to a base station computer 3 via satellite communication, an FD, etc. The transferred data is stored as a database 100 in the base station computer 3. The base station computer 3 reads the data stored in the database 100 for each hydraulic excavator, calculates a working time of a part belonging to each section on the basis of the working time of that section, and compares the calculated working time with a preset target replacement time interval of the relevant part, thereby calculating a remaining time up to next replacement of the relevant part and managing the scheduled replacement timing thereof. Thus, the appropriate scheduled replacement timing of parts can be determined even in a construction machine having a plurality of sections that differ in working time from each other.
摘要:
A function changing system of construction machinery includes a hydraulic excavator and a base station. The hydraulic excavator is deployed at a construction site and is provided with a rewritable memory storing control programs and/or data required for control of the machinery, a CPU for reading out the control programs from the memory and executing them, and a communications device The base station is provided with a communications device, a center server for identifying the serial number of the hydraulic excavator and transferring information with the control unit, and a database managed by the center server and storing control programs corresponding to the hydraulic excavator. When changing or switching an attachment of the hydraulic excavator, information is transferred with the center server of the base station and the control programs or data stored in the storage unit are rewritten to enable work suited to the changed part.