Gradient system
    4.
    发明授权
    Gradient system 失效
    渐变系统

    公开(公告)号:US5234587A

    公开(公告)日:1993-08-10

    申请号:US905742

    申请日:1992-06-29

    IPC分类号: G01N30/34

    CPC分类号: G01N30/34 G01N2030/347

    摘要: To supply a programmed gradient to a high pressure pump for introduction into a column, a mixer, degasser and accumulator communicates with the high pressure pump to supply fluid thereto, having a volumn no more than 150 times the chamber volume of the high pressure pump. The mixer, degasser and accumulator includes temperature sensors which sense when the mixer, degasser and accumulator has been emptied to a level where it cannot respond to a demand for fluid from said high pressure pump and provides a signal to a low pressure pump which responds by cycling to again fill the mixer, degasser and accumulator. Upon receiving a demand signal, the low pressure pump fills by drawing fluid from a plurality of fluid sources to compose the gradient being used at that time, with the pump slowing during valve opening and closing so as to avoid cavitation.

    摘要翻译: 为了向高压泵提供编程梯度以引入塔中,混合器,脱气器和蓄能器与高压泵连通以向其供应流体,其体积不高于高压泵的室容积的150倍。 混合器,脱气机和蓄能器包括温度传感器,其感测混合器,脱气器和蓄能器何时被排空到不能响应来自所述高压泵的流体需求的水平,并且向低压泵提供信号,该低压泵由 循环再次填充混合器,脱气机和蓄压器。 在接收到需求信号时,通过从多个流体源抽取流体来填充低压泵以构成当时使用的梯度,同时在阀打开和关闭期间泵减慢,以避免空化。

    Gradient system
    9.
    发明授权
    Gradient system 失效
    渐变系统

    公开(公告)号:US5158675A

    公开(公告)日:1992-10-27

    申请号:US535565

    申请日:1990-06-11

    IPC分类号: G01N30/34

    摘要: To supply a programmed gradient to a high pressure pump for introduction into a column, a mixer, degasser and accumulator communicates with the high pressure pump to supply fluid thereto, having a volume no more than 150 times the chamber volume of the high pressure pump. The mixer, degasser and accumulator includes temperature sensors which sense when the mixer, degasser and accumulator has been emptied to a level where it cannot respond to a demand for fluid from said high pressure pump and provides a signal to a low pressure pump which responds by cycling to again fill the mixer, degasser and accumulator. Upon receiving a demand signal, the low pressure pump fills by drawing fluid from a plurality of fluid sources to compose the gradient being used at that time, with the pump slowing during valve opening and closing so as to avoid cavitation.

    摘要翻译: 为了向高压泵提供编程梯度以引入塔中,混合器,脱气器和蓄能器与高压泵连通以向其提供流体,其体积不超过高压泵的室容积的150倍。 混合器,脱气机和蓄能器包括温度传感器,其感测混合器,脱气器和蓄能器何时被排空到不能响应来自所述高压泵的流体需求的水平,并且向低压泵提供信号,该低压泵由 循环再次填充混合器,脱气机和蓄压器。 在接收到需求信号时,通过从多个流体源抽取流体来填充低压泵以构成当时使用的梯度,同时在阀打开和关闭期间泵减慢,以避免空化。