-
公开(公告)号:US12006711B2
公开(公告)日:2024-06-11
申请号:US18252238
申请日:2021-10-25
发明人: Johnny Andersson
CPC分类号: E04G5/12 , B29C44/1271 , E04G1/14 , E04G5/001 , E04G5/08 , B29K2905/02 , B29K2905/12 , B29K2995/0015 , B29L2031/10
摘要: Scaffolding element (100) with insulation, said scaffolding element (100) comprising a frame (110) of metal braces (111) and a set of fastening means (120), arranged to fasten the scaffolding element (100) to a supporting structure (20) of a scaffolding structure (10).
The invention is characterised in that the scaffolding element (100) furthermore comprises a block (130) of insulating material, and in that the block (130) is cast around the frame (110), so that the frame (110) is completely covered by said insulating material but so that the fastening means (120) are not covered by said insulating material.
The invention also relates to a manufacturing method and a kit of parts.-
公开(公告)号:US20230332419A1
公开(公告)日:2023-10-19
申请号:US18044636
申请日:2021-09-15
申请人: Avestin Limited
发明人: Gavin Balue
CPC分类号: E04G5/12 , E04G5/14 , E04G21/24 , E04G2021/248
摘要: An improved scaffolding tie (1c) for connecting a scaffolding tarpaulin (8) to a scaffolding pole (9) is disclosed. The tie (1c) comprises an anchor (4c) for anchoring the tie (1c) to the scaffolding tarpaulin(S), an attachment portion (6c) for attaching the tie (1c) to a scaffolding pole (9), and a ligament (5c). The ligament (5c) is connected between the anchor (4c) and the attachment portion (6c) and arranged, in use, to bias the anchor and attachment portion towards one another. The attachment portion (6c) comprises a fastening means (2c) and a connector piece (60c) arranged, in use, to reversibly connect to one another to form a loop around a scaffolding pole (9).
-
公开(公告)号:US20190194957A1
公开(公告)日:2019-06-27
申请号:US16222258
申请日:2018-12-17
申请人: Wurtec, Incorporated
发明人: Steven P. Wurth , Terry Rodebaugh
CPC分类号: E04G5/12 , B66B5/005 , E04G3/28 , E04G5/142 , E04G2003/286 , E04G2005/125
摘要: A break-away canopy assembly configured for use with a work platform in an elevator hoistway is provided. The break-away canopy assembly includes a plurality of spaced apart canopy posts in a substantially vertical orientation. A first support framework is connected to one or more of the spaced apart canopy posts. A second support framework is connected to one or more of the spaced apart canopy posts and opposes the first support framework. The first and second support frameworks each have connected first and second extension assemblies. One or more roof sections span and are connected to the first and second support frameworks. The first and second extension assemblies of the first support framework and the first and second extension assemblies of the second support frameworks are each configured to separate from each other in the event of an uncontrolled descent of the work platform.
-
4.
公开(公告)号:US09550592B2
公开(公告)日:2017-01-24
申请号:US14284502
申请日:2014-05-22
发明人: Claude Granger , Jean Roy , Sylvain Made
IPC分类号: E04H7/22 , B65B23/00 , B21B39/02 , B65B55/00 , B65B55/20 , B23P23/06 , E04H5/02 , B23Q3/18 , E04G21/24 , E04H9/00 , B21B39/04 , B21B39/16 , B21B39/34 , B66F5/04 , A47B3/06 , A47B37/00 , B61B13/12 , B66D1/60 , E04G3/24 , E04G1/18 , B66C1/66 , B65G67/02 , B01D3/32 , F25J3/04 , B66C1/10 , B01J19/32 , E04G1/36 , E04G5/14 , E04G21/28 , E04F11/18 , E04G1/15 , E04G5/06 , E04G21/14 , B23K9/02 , B23K9/173 , B23K9/23 , B65B65/00 , B21D5/12 , B21C37/08 , B21D5/14 , B21C37/083 , E04H5/10 , E04G5/12
CPC分类号: B65B23/00 , A47B3/06 , A47B37/00 , B01D3/00 , B01D3/28 , B01D3/32 , B01J19/325 , B01J2219/32275 , B21B39/02 , B21B39/04 , B21B39/16 , B21B39/34 , B21C37/0815 , B21C37/083 , B21D5/12 , B21D5/14 , B21D51/18 , B23K9/0206 , B23K9/173 , B23K9/23 , B23K2101/06 , B23K2103/02 , B23P23/06 , B23Q3/18 , B61B13/12 , B65B55/00 , B65B55/20 , B65B65/003 , B65G67/02 , B66C1/10 , B66C1/66 , B66D1/60 , B66F5/04 , E04F11/181 , E04F15/02482 , E04G1/15 , E04G1/153 , E04G1/18 , E04G1/362 , E04G3/24 , E04G5/061 , E04G5/12 , E04G5/14 , E04G21/142 , E04G21/242 , E04G21/28 , E04G2005/125 , E04G2021/248 , E04H5/02 , E04H5/10 , E04H7/06 , E04H7/22 , E04H9/00 , E04H15/04 , F25J3/0489 , F25J2290/42 , Y10T29/49631 , Y10T29/49817 , Y10T29/49826 , Y10T29/49998 , Y10T29/5137 , Y10T29/53974
摘要: A method for moving a packed column section about a remote manufacturing yard is provided. In one embodiment, the packed column section can include a first course, a second course, packing disposed within the first course and second course, and a plurality of distributors. The method can include the steps of placing the packed column section on top of a movable platform, the movable platform configured to support and distribute the weight of the packed column section; and moving the packed column section from a first point to a second point, the second point being in an open area adapted for stacking a plurality of packed column sections on top of each other to form a column.
摘要翻译: 提供了一种用于移动围绕远程制造场地的填充柱部分的方法。 在一个实施例中,填充柱部分可以包括第一过程,第二过程,设置在第一过程和第二过程中的填料以及多个分配器。 该方法可以包括以下步骤:将填充柱部分放置在可移动平台的顶部上,可移动平台构造成支撑和分配填充柱部分的重量; 以及将所述填充柱部分从第一点移动到第二点,所述第二点处于适于堆叠彼此之上的多个填充柱部分的开放区域中以形成柱。
-
5.
公开(公告)号:US09302798B2
公开(公告)日:2016-04-05
申请号:US14284510
申请日:2014-05-22
发明人: Claude Granger , Yves Hardy , Emmanuelle Bromet , Jean Roy , Philippe Grigoletto , Qun-Fang Li , Herve Ferriere , Sylvain Made
IPC分类号: B01D3/32 , E04H7/06 , B65B23/00 , B65B55/00 , B65B55/20 , B23P23/06 , E04H5/02 , B23Q3/18 , E04G21/24 , E04H9/00 , B21B39/04 , B21B39/16 , B21B39/34 , B66F5/04 , A47B3/06 , A47B37/00 , B61B13/12 , B66D1/60 , E04G3/24 , E04G1/18 , B66C1/66 , B65G67/02 , F25J3/04 , B66C1/10 , B01J19/32 , E04G1/36 , E04G5/14 , E04G21/28 , E04F11/18 , E04G1/15 , E04G5/06 , E04G21/14 , B23K9/02 , B23K9/173 , B23K9/23 , B65B65/00 , E04H5/10 , E04G5/12
CPC分类号: B65B23/00 , A47B3/06 , A47B37/00 , B01D3/00 , B01D3/28 , B01D3/32 , B01J19/325 , B01J2219/32275 , B21B39/02 , B21B39/04 , B21B39/16 , B21B39/34 , B21C37/0815 , B21C37/083 , B21D5/12 , B21D5/14 , B21D51/18 , B23K9/0206 , B23K9/173 , B23K9/23 , B23K2101/06 , B23K2103/02 , B23P23/06 , B23Q3/18 , B61B13/12 , B65B55/00 , B65B55/20 , B65B65/003 , B65G67/02 , B66C1/10 , B66C1/66 , B66D1/60 , B66F5/04 , E04F11/181 , E04F15/02482 , E04G1/15 , E04G1/153 , E04G1/18 , E04G1/362 , E04G3/24 , E04G5/061 , E04G5/12 , E04G5/14 , E04G21/142 , E04G21/242 , E04G21/28 , E04G2005/125 , E04G2021/248 , E04H5/02 , E04H5/10 , E04H7/06 , E04H7/22 , E04H9/00 , E04H15/04 , F25J3/0489 , F25J2290/42 , Y10T29/49631 , Y10T29/49817 , Y10T29/49826 , Y10T29/49998 , Y10T29/5137 , Y10T29/53974
摘要: A method for fabricating a distillation column in a remote location away from a permanent manufacturing facility is provided. In one embodiment, the method can include the steps of: forming a plurality of column sections each having a diameter D, each column section comprising a plurality of courses that have been horizontally welded together, wherein each course is comprised of two or more partial shells that have been vertically welded together, wherein each of the two or more partial shells was created by vertically rolling a rectangular plate having a length of at least ( 1 N π · D ) , wherein N is the number of partial shells used to form the course; installing a distributor and packing in each column section to form a plurality of packed column sections; and stacking the plurality of packed column sections to form a column.
摘要翻译: 提供了一种在远离永久性制造设施的远程位置制造蒸馏塔的方法。 在一个实施例中,该方法可以包括以下步骤:形成多个具有直径D的柱段,每个柱段包括已经被水平焊接在一起的多个球道,其中每个球道由两个或更多个部分球 已经被垂直焊接在一起,其中两个或更多个部分壳中的每一个是通过垂直滚动长度至少为(1 N& D)的矩形板而产生的,其中N是用于 形成课程; 在每个柱部分安装分配器和包装件以形成多个填充柱部分; 并堆叠多个填充柱部分以形成柱。
-
公开(公告)号:US20140345352A1
公开(公告)日:2014-11-27
申请号:US14284487
申请日:2014-05-22
发明人: Claude GRANGER , Jean ROY
CPC分类号: B65B23/00 , A47B3/06 , A47B37/00 , B01D3/00 , B01D3/28 , B01D3/32 , B01J19/325 , B01J2219/32275 , B21B39/02 , B21B39/04 , B21B39/16 , B21B39/34 , B21C37/0815 , B21C37/083 , B21D5/12 , B21D5/14 , B21D51/18 , B23K9/0206 , B23K9/173 , B23K9/23 , B23K2101/06 , B23K2103/02 , B23P23/06 , B23Q3/18 , B61B13/12 , B65B55/00 , B65B55/20 , B65B65/003 , B65G67/02 , B66C1/10 , B66C1/66 , B66D1/60 , B66F5/04 , E04F11/181 , E04F15/02482 , E04G1/15 , E04G1/153 , E04G1/18 , E04G1/362 , E04G3/24 , E04G5/061 , E04G5/12 , E04G5/14 , E04G21/142 , E04G21/242 , E04G21/28 , E04G2005/125 , E04G2021/248 , E04H5/02 , E04H5/10 , E04H7/06 , E04H7/22 , E04H9/00 , E04H15/04 , F25J3/0489 , F25J2290/42 , Y10T29/49631 , Y10T29/49817 , Y10T29/49826 , Y10T29/49998 , Y10T29/5137 , Y10T29/53974
摘要: A trolley for supporting the plate during vertical rolling of the plate is provided. In one embodiment, the trolley can include a support body configured to provide support for the trolley; a plurality of wheels configured to allow the trolley to move across a floor; a lifting arm supported by the support body, wherein the lifting arm is movable about a first position and a second position; a pump handle configured to raise the lifting arm between the first position and the second position; and a plate holder configured to move with the lifting arm and hold the plate in place relative to the trolley.
摘要翻译: 提供了用于在板的垂直轧制期间支撑板的手推车。 在一个实施例中,手推车可以包括构造成为手推车提供支撑的支撑体; 多个车轮,其被构造成允许台车移动穿过地板; 由所述支撑体支撑的提升臂,其中所述提升臂可围绕第一位置和第二位置移动; 泵手柄,其构造成在所述第一位置和所述第二位置之间升高所述提升臂; 以及板保持器,其构造成与提升臂一起移动并相对于手推车将板保持在适当位置。
-
公开(公告)号:US20130318889A1
公开(公告)日:2013-12-05
申请号:US13910821
申请日:2013-06-05
申请人: John E. Brown , Adam L. Cole
发明人: John E. Brown , Adam L. Cole
IPC分类号: E04G3/24
CPC分类号: E04G3/24 , E04G5/12 , E04G7/307 , Y10T403/30
摘要: A scaffold wall system for erecting temporary insulated facilities using a scaffold structure for support is disclosed. The system comprises a floor supported by the scaffold structure, a plurality of walls supported by the floor, and a ceiling supported by the walls. The floor comprises a plurality of support beams laid across the scaffold structure, and floor boards laid across the support beams. The walls comprise a plurality of wall panels placed into customized tracks secured to the floor. Insulative sleeves are placed between the wall panels. The ceiling also comprises a plurality of panels with insulative sleeves. The system allows for multiple levels of temporary insulated facilities to be erected within a scaffold.
摘要翻译: 公开了一种用于搭建使用支架支架结构的临时绝缘设施的脚手架墙系统。 该系统包括由脚手架结构支撑的地板,由地板支撑的多个壁和由壁支撑的天花板。 地板包括穿过脚手架结构的多个支撑梁,以及铺设在支撑梁上的地板。 墙壁包括多个壁板,其放置在固定到地板上的定制轨道中。 绝缘套管放置在墙板之间。 天花板还包括具有绝缘套筒的多个面板。 该系统允许在脚手架内架设多层次的临时绝缘设施。
-
公开(公告)号:US20130272784A1
公开(公告)日:2013-10-17
申请号:US13551345
申请日:2012-07-17
申请人: Alexander Chau
发明人: Alexander Chau
IPC分类号: F16D1/00
CPC分类号: E04G5/12 , E04G7/14 , F16B2200/509 , F16L37/123 , Y10T403/535 , Y10T403/7064
摘要: An elongated clamp for securing a flexible fabric-like shroud to a scaffold support member including two opposed jaws movable between an open and closed position by a one pin and an at-least-one wedge combination. The flexible shroud is held to the support member by the clamp's gripping force. Multiple clamps securable at different points along the various standard support members can provide positive securement of the shroud.
摘要翻译: 一种用于将柔性织物状护罩固定到支架构件的细长夹具,其包括两个相对的夹爪,所述两个相对的夹爪在打开和关闭位置之间通过一个销和至少一个楔形组合可移动。 柔性护罩通过夹具的夹持力保持在支撑构件上。 沿着各种标准支撑构件在不同点可固定的多个夹具可以提供护罩的正确固定。
-
9.
公开(公告)号:US20100140018A1
公开(公告)日:2010-06-10
申请号:US12531846
申请日:2008-03-19
申请人: Dick Buitendijk
发明人: Dick Buitendijk
摘要: A scaffold has several spaced apart systems of construction frames present on top of each other, as well as handrail frames that extend between the construction frames. The construction frames have three posts connected together by crossbars, in which the front post is shorter than the other two. The handrail frames are attached to these short posts. Each handrail frame is built up of two post sections with a handrail and a side plank between them. The post sections form half of a lengthwise divided post. The post sections of two adjacent handrail frames thus form one whole post, which can be inserted into the short post of a construction frame. As the post sections are part of the handrail frames, the handrail frames can be easily attached to the short posts already present at the front of the construction frames.
摘要翻译: 支架具有彼此顶部的多个间隔开的构造框架系统,以及在构造框架之间延伸的扶手框架。 建筑框架具有通过横梁连接在一起的三个柱,其中前柱比另外两个柱短。 扶手框架连接到这些短柱上。 每个扶手架由两个后部段组成,扶手和扶手之间的侧板。 后段形成纵向分割柱的一半。 因此,两个相邻的扶手框架的柱部分形成一个整个柱,其可插入施工框架的短柱中。 由于支柱部分是扶手框架的一部分,扶手框架可以容易地附接到已经存在于施工框架前部的短位置。
-
公开(公告)号:US5613543A
公开(公告)日:1997-03-25
申请号:US346690
申请日:1994-11-30
申请人: Ronald W. Walton
发明人: Ronald W. Walton
摘要: The present invention provides temporary protection of outside objects from wind, rain, snow, or other elements. In particular, the present invention is a system of supports and fabric or plastic panels that are erected to provide a continuous protective covering over an area, structure, or object. The components of the system may be assembled in various configurations as the situation demands. The system requires minimal labor to install and the covering can be readily raised and lowered as desired.
摘要翻译: 本发明提供外部物体免受风,雨,雪或其他元件的临时保护。 特别地,本发明是一种支撑体和织物或塑料面板的系统,其被竖立以在区域,结构或物体上提供连续的保护性覆盖物。 根据情况需要,可以以各种配置组装系统的组件。 该系统需要极少的安装工作,并且可以根据需要容易地升高和降低覆盖物。
-
-
-
-
-
-
-
-
-