METHOD AND ASSEMBLY SYSTEM FOR AUTOMATED MACHINE BASED PRODUCT ASSEMBLING

    公开(公告)号:US20240345565A1

    公开(公告)日:2024-10-17

    申请号:US18294231

    申请日:2022-08-08

    IPC分类号: G05B19/4155 B23P21/00

    摘要: It is proposed to assemble a product on a modular basis from product parts to be assembled, wherein the product assembling being split into two separate operations, by (i) automated machine fetching as well as automated machine placing the product parts part-by-part from a delivery area on optically localized distribution fixtures at a hand-over area in the course of a logistic distribution operation and a distribution fixture placed product part from optically localized distribution fixtures at the hand-over area on optically localized assembly fixtures at an assembly workspace in the course of an assembly operation, (ii) computing and executing by automated machine motion generation primary kinematic machine-motion-sequences and secondary kinematic machine-motion-sequences, (iii) providing an automated machine architecture to enable or ensure, based on a “world model for automated machines”, a three-dimensional model of an assembly environment, information ANG, of the product and the product parts and an “automated machine workflow.”

    SYSTEMS AND METHODS FOR OPTIMIZING OPERATION AT A MANUFACTURING ASSEMBLY LINE

    公开(公告)号:US20240231327A1

    公开(公告)日:2024-07-11

    申请号:US18397459

    申请日:2023-12-27

    申请人: ATS Corporation

    IPC分类号: G05B19/418 B23P21/00

    摘要: Various systems and methods for optimizing operation at a manufacturing assembly line are disclosed. A method for optimizing operation at a manufacturing assembly line having a track on which a plurality of shuttles travel, the track including one or more stations at which a production task occurs and one or more track areas defined relative to the one or more stations, includes monitoring shuttle operation data associated with the plurality of shuttles on the track, and track sensor data associated with an operation state of the track; detecting an operation variation at the manufacturing assembly line based on the shuttle operation data; in response to detecting the operation variation, analyzing the shuttle operation data and the track sensor data to determine one or more degradation causes resulting in the operation variation; and generating an operation recommendation for resolving at least one degradation cause of the one or more degradation causes.

    Aircraft assembly formed of mating half barrel sections and the method of assembling the same

    公开(公告)号:US11801576B2

    公开(公告)日:2023-10-31

    申请号:US17454280

    申请日:2021-11-10

    IPC分类号: B23P21/00 B64F5/10

    摘要: Systems and methods are provided for assembling an airframe of an aircraft, including receiving a half barrel section of fuselage, advancing the half barrel section in a process direction across multiple stations to separately and simultaneously perform work on the half barrel sections, and subsequently joining the half barrel segments to form a section of the airframe. Each pair of half barrel sections, such as upper and lower half barrels, are progressed through assembly line processes to be delivered to a joining station for joining the half barrels together to form a circumferential section of the fuselage. Multiple joined circumferential sections are joined together to form an elongated extent of the fuselage. Indexing features are provided in the assembly process to monitor and control the progression of the half barrel sections in the work stations of the assembly line process.

    Automated modular construction factory method and system

    公开(公告)号:US11794293B2

    公开(公告)日:2023-10-24

    申请号:US17735928

    申请日:2022-05-03

    摘要: A method and system for an automated modular construction factory is presented. A plurality of pre-cast construction panels, a quality control zone, a transportation system, a general stockyard, a sequencing system, an assembly zone, an assembly system, a transit system, a finishing zone, and a plurality of finishing stations are provided. The pre-cast construction panels undergo quality control under the quality control zone and are transported and ordered to the general stockyard through the transportation and sequencing systems. The panels are then assembled into a constructed room in the assembly zone through the assembly system. The constructed room is transported by the transit system to the finishing zone where the constructed room is furnished and completed by the plurality of finishing stations.