摘要:
A bidirectional interleaved DC to DC converter comprises positively coupled filter inductors that are coupled to a switching network that receives power from a DC power source, such as a battery. The positively coupled inductors are integrated as a single coupled inductor, which allows the DC to DC converter to convert DC voltage to various voltage levels with reduced voltage ripple, without the need for supplemental filter capacitors that are large and costly.
摘要:
A microgrid including a renewable power source is optimized by treating the renewable source as operating in an isochronous mode, and by decomposing the optimization process. A renewable capability is defined for the renewable source to enable treatment of the renewable source as operating in an isochronous mode. The renewable capability may be based on a power rating of the renewable source. An objective function of the microgrid optimization problem may then be optimized while treating the renewable source as operating in an isochronous mode. A penalty factor may be applied to avoid power shortage.
摘要:
A method of operating capacitor banks includes obtaining a reactive power shortage curve forecast for a time period. At least one capacitor bank power schedule curve is generated to supply reactive power to the power grid during the time period. The at least one capacitor bank power schedule curve is updated to generate an optimized capacitor bank power schedule curve to reduce the area between the reactive power shortage curve and the capacitor bank power schedule curve. The method also includes providing switching signal commands for operating capacitor banks based on the optimized capacitor bank power schedule curve.
摘要:
A method of detecting onset of a gas turbine condition, such as compressor stall, includes receiving data indicative of an operating parameter of a compressor of the gas turbine. The method also includes performing a wavelet transformation on the data to generate wavelet transformed data. The wavelet transformation is configured to affect a processing characteristic regarding a performance of the wavelet transformation. Features indicative of onset of the gas turbine condition in the wavelet transformed data are then identified to provide an indication for controlling the gas turbine to prevent compressor stall from occurring. A system for detecting onset of compressor stall in a gas turbine includes a sensor for providing data indicative of an operating parameter of the compressor and a processor for performing a wavelet transform on the data to identify features of the optimized wavelet transformed data indicative of onset of stall.
摘要:
A processor system and method for integrating a quality function deployment tool with a critical to quality tool is provided. Each of the tools is a computer-enabled tool. The method allows for executing quality function deployment at each of a plurality of levels with the quality function deployment tool for a system designable from a respective family of subsystem alternatives. The method further allows for generating quality matrices indicating a relationship between an original set of critical to quality characteristics and key control parameters with the critical to quality tool for the respective family of subsystem alternatives. A linking action allows for linking the quality function deployment tool to the critical to quality tool for tracking at each level the extent to which the original set of critical to quality characteristics is met by each respective family of subsystem alternatives.
摘要:
A power forecasting module determines a load forecast of a distribution system (DS) and a power generation forecast of distributed energy resources (DERs) A demand response (DR) module estimates an available DR based on the load and the power generation forecast and modifies the load forecast by dispatching an optimal DR. An energy storage commitment module determines a charging/discharging schedule of energy storage devices in the system based on the modified load profile and generates a second load profile by incorporating the charging/discharging schedule of energy storage devices. An unit commitment (UC) module determines a DER schedule of supplying electrical power to the loads in the second load profile based on a first objective function. An economic dispatch (ED) module determines an optimum operating point for each DER and an Integrated Volt-VAR Control (IVVC) module controls distribution assets to maintain a voltage profile in the system.
摘要:
A power generation system including an electrolyzer may be optimized taking non-linear operational constraints into account with lower processing requirements than current solutions in real time. A pre-processing module assesses non-linear operational constraints in a low-overhead manner and passes results to an optimization module. The optimization module determines an operating power value constrained in accordance with results from the pre-processing module. A post-processing module uses results from the pre-processing and optimization modules to assemble instructions to control the electrolyzer. As a result, optimization may be performed in real time.
摘要:
Certain embodiments of the invention may include systems and methods for accelerating volt/VAR load flow optimization. According to an example embodiment of the invention, a method is provided for accelerating load flow for integrated volt/var control (IVVC) optimization. The method can include evaluating load flow on lines of an electrical network, identifying combinable network lines, combining the identified combinable network nodes to reduce network complexity, and determining load flow optimization for IVVC based at least in part on the reduced complexity network.
摘要:
Certain embodiments of the invention may include systems, methods, and apparatus for providing coordinated volt/volt-amps-reactive (VAR) control in power distribution networks. According to an example embodiment of the invention, a method is provided for coordinating voltage and volt-amps-reactive (VAR) control (VVC) in power distribution networks. The method can include receiving one or more VVC objective functions from a distribution management system (DMS); determining at least one microgrid conservation voltage reduction factor (CVRF); forecasting microgrid load profile for a predetermined period of time; controlling microgrid VVC resources based at least on the one or more received VVC objective functions; and communicating the at least one microgrid CVRF and the forecasted load profile to the DMS.
摘要:
A boiling water reactor core power level monitoring system includes a desired length of high dielectric, non-linear material insulated coaxial type cable in close proximity to the reactor core and a time domain reflectometry apparatus configured to measure a temporary characteristic impedance change associated with the coaxial type cable in response to at least one of neutron or gamma irradiation generated via the reactor core.