COMPUTING COMPONENT ARRANGEMENT BASED ON RAMPING CAPABILITIES

    公开(公告)号:US20240403979A1

    公开(公告)日:2024-12-05

    申请号:US18806206

    申请日:2024-08-15

    Applicant: LANCIUM LLC

    Abstract: Examples relate to a method includes monitoring a set of parameters. The set of parameters are associated with a first set of computing components and a second set of computing components. The first set of computing components is located in a first region and the second set of computing components is located in a second region. The first region is positioned proximate a generation station control system associated with a generation station and the second region is positioned remotely from the generation station control system. Each computing system of the second set of computing systems is configured to adjust power consumption during operation. The method also includes adjusting power consumption at one or more computing components of the second set of computing components based on the set of parameters.

    MODIFYING COMPUTING SYSTEM OPERATIONS BASED ON COST AND POWER CONDITIONS

    公开(公告)号:US20220366517A1

    公开(公告)日:2022-11-17

    申请号:US17868381

    申请日:2022-07-19

    Applicant: LANCIUM LLC

    Abstract: Examples relate to flexible datacenters or other power loads tolerant of intermittent operation and configured to use power received behind-the-meter. A system may include a set of computing systems powered by behind-the-meter power and a datacenter control system. The datacenter control system may be configured to monitor a set of conditions that includes behind-the-meter power availability at the set of computing systems and perform a weighted analysis using the set of monitored conditions. Based on the weighted analysis, the datacenter control system may be configured to modulate operating attributes of one or more computing systems of the set of computing systems. In some examples, the datacenter control system is a remote master control system in communication with a datacenter control system of a flexible datacenter housing the set of computing systems.

    METHODS AND SYSTEMS FOR ADJUSTING POWER CONSUMPTION BASED ON A FIXED-DURATION POWER OPTION AGREEMENT

    公开(公告)号:US20210294405A1

    公开(公告)日:2021-09-23

    申请号:US17340886

    申请日:2021-06-07

    Applicant: LANCIUM LLC

    Abstract: Examples relate to adjusting load power consumption based on a power option agreement. A computing system may receive power option data that is based on a power option agreement and specify minimum power thresholds associated with time intervals. The computing system may determine a performance strategy for a load (e.g., set of computing systems) based on a combination of the power option data and one or more monitored conditions. The performance strategy may specify a power consumption target for the load for each time interval such that each power consumption target is equal to or greater than the minimum power threshold associated with each time interval. The computing system may provide instructions the set of computing systems to perform one or more computational operations based on the performance strategy.

    METHODS AND SYSTEMS FOR DISTRIBUTED POWER CONTROL OF FLEXIBLE DATACENTERS

    公开(公告)号:US20230259192A1

    公开(公告)日:2023-08-17

    申请号:US18139134

    申请日:2023-04-25

    Applicant: LANCIUM LLC

    CPC classification number: G06F1/3234 G06F1/329 G06F1/3296 G06F1/324 G06F1/3287

    Abstract: In an example embodiment, a distributed power control system can include a datacenter and a remote master control system. The datacenter can include (i) computing systems, (ii) a behind-the-meter power input system configured to receive power from a behind-the-meter power source and deliver power to the computing systems, and (iii) a datacenter control system configured to control the computing systems and the behind-the-meter power input system. The remote master control system can be configured to issue instructions to the datacenter that affect an amount of behind-the-meter power consumed by the datacenter. The datacenter control system can receive, from a local station control system configured to at least partially control the behind-the-meter power source, a directive for the datacenter to ramp-down power consumption, and in response to receiving the directive, cause the computing systems to perform a set of predetermined operations correlated with the directive.