摘要:
An intermediate server 6 or a main server 5 executes the steps of displaying a work site of a construction machine or a predetermined area regarding the work site on a subcontractor's personal computer 62, prompting an input for applying to an order for work of repair/replacement of parts belonging to a predetermined component section of the construction machine, extracting the predetermined qualification requirements, which have been stored in a database 6A beforehand, from the database based on received applying information, producing an examination sheet for determining whether a local subcontractor meets the extracted qualification requirements, transmitting the examination sheet produced in the producing step to the subcontractor's personal computer 62 via a communication network, and prompting an input in predetermined places of the examination sheet. An information processing system and an information processing method for construction machines are provided which can present satisfactory services to the customer side even when the work site is in, e.g., a remote frontier region.
摘要:
An information providing system for a construction machine has a plurality of information terminals (4) provided on the side of users or owners of hydraulic excavators (1), a main server (5) provided on the side of a manufacturer of the hydraulic excavators, and an intermediate server (6) provided on the side of a dealer in charge of services presented to the users or the owners. The main server (5) obtains data regarding machine operation of each hydraulic excavator (1) via information communication and stores the obtained data in a database (5A ), and outputs the obtained data regarding the machine operations of the plurality of hydraulic excavators (1), as basic information for services presented to the users or the owners, to the intermediate server (6). The intermediate server (6) outputs, to the corresponding information terminal (4), the basic information directly or after optionally selecting the basic information.
摘要:
An intermediate server 6 or a main server 5 executes the steps of displaying a work site of a construction machine or a predetermined area regarding the work site on a subcontractor's personal computer 62, prompting an input for applying to an order for work of repair/replacement of parts belonging to a predetermined component section of the construction machine, extracting the predetermined qualification requirements, which have been stored in a database 6A beforehand, from the database based on received applying information, producing an examination sheet for determining whether a local subcontractor meets the extracted qualification requirements, transmitting the examination sheet produced in the producing step to the subcontractor's personal computer 62 via a communication network, and prompting an input in predetermined places of the examination sheet. An information processing system and an information processing method for construction machines are provided which can present satisfactory services to the customer side even when the work site is in, e.g., a remote frontier region.
摘要:
A method and system for managing a construction machine whereby working time for each of different parts of a hydraulic excavator is measured. Measured data is stored in a memory of a controller and then transferred to a base station computer via satellite communication to be stored in a database. At each repair/replacement of a part in each hydraulic excavator, the base station computer calculates, based on the operation data, a replacement time interval of the part on the basis of the working time per section to which the part belongs, and then stores and accumulates it. The base station computer also reads the stored data for each hydraulic excavator, determines, for each part, a replacement rate of the part having a substantially equal replacement time interval, and calculates a target replacement time interval of the part in accordance with the replacement time interval corresponding to a maximum replacement rate.
摘要:
A function changing system of construction machinery includes a hydraulic excavator and a base station. The hydraulic excavator is deployed at a construction site and is provided with a rewritable memory storing control programs and/or data required for control of the machinery, a CPU for reading out the control programs from the memory and executing them, and a communications device The base station is provided with a communications device, a center server for identifying the serial number of the hydraulic excavator and transferring information with the control unit, and a database managed by the center server and storing control programs corresponding to the hydraulic excavator. When changing or switching an attachment of the hydraulic excavator, information is transferred with the center server of the base station and the control programs or data stored in the storage unit are rewritten to enable work suited to the changed part.
摘要:
The position of a working machine is detected, a position signal representing the detected position is transmitted, the position signal is received, management information relating to the working machine is calculated based on the received position signal, and the calculated management information is transmitted to the working machine. Example of management information is type of attachment depending on soil quality, and weather forecasts.
摘要:
A calculating portion 7a calculates a distance from the tip end of a front device to an interference prevention area, and a detection line 7m detects a moving speed of a boom 1. If the tip end of the front device comes close to the interference prevention area when the boom 1 is moving upward, control is made such that, while continuing to move the boom 1 upward, a control gain calculating portion 7h and a multiplier 7i cooperatively calculate a target speed of an arm in the arm dumping direction (interference avoiding direction) corresponding to the boom-up speed, and an input limit value calculating portion 7c, an adder 7j and a minimum value selecting portion 7f cooperatively control the arm to move in the interference avoiding direction relative to a vehicle body. Interference avoidance control enabling the tip end of the front device to be moved smoothly along the vicinity of a boundary of the interference prevention area is thereby effected and the front device can be prevented from interfering with the vehicle body without reducing the maneuverability and the working efficiency.
摘要:
Assessment information needed to calculate a used vehicle assessment value of a hydraulic excavator 10 is input to a portable telephone 20 and is then transmitted from the portable telephone 20. The transmitted assessment information is received at a manufacturer's base station 40 at a remote location. The used vehicle assessment value of the hydraulic excavator 10 is calculated based upon the received assessment information, and history information and operation information on the hydraulic excavator 10 read out from an operation information database 43 and a history database 42 in correspondence to an ID number assigned to the hydraulic excavator which is included in the assessment information.
摘要:
In a rental estimation method according to the present invention, rental information with regard to rental devices is provided to a customer through a data exchange between a terminal (9) of the customer and a management server (5) of a rental company. The rental estimation method includes a data input step for entering work content data indicating a work content through the customer terminal (9), and a necessary device reporting step for reading out a list of a plurality of necessary devices matching the work content and rental information corresponding to the necessary devices from a predefined database (2 to 4) and for providing them to the customer.
摘要:
A security system of a construction machine of the present invention has a construction machine, a base station and a communication device. The construction machine comprises a data sending and receiving portion for sending first information, a storage portion for storing received information, and a control portion for controlling an operation of the construction machine. The base station receives the first information from the data sending and receiving portion of the construction machine and sends second information to the construction machine and manages the construction machine. It is configured so that the communication device is connected to the base station through a communication network and can send third information to the construction machine through the base station.