摘要:
A system for cooling an electronic device having a heat-generating component includes a passive cooling device having a cooling ability designed to expire after a predetermined amount of heat is absorbed from the heat-generating component and an active cooling device configured to at least one of dissipate heat generated by the heat-generating component and cool the passive cooling device, when the active cooling device is activated. The system also includes a controller configured to activate the active cooling device after a determination that a predetermined threshold condition has occurred, wherein the predetermined threshold condition is selected to occur after the passive cooling device cooling ability has substantially expired, to thereby substantially minimize power consumption of the active cooling device in cooling the heat-generating component.
摘要:
In a method for managing cooling provisioning in a three-dimensional package containing a plurality of stacked die with a cooling system having at least one active cooling mechanism, at least one of workload on and an environmental condition at or around one of the plurality of stacked die is identified. In addition, at least one of the active cooling mechanism and the one of the plurality of stacked die is controlled based upon at least one of the identified workload and environmental condition.
摘要:
A digital media drive failure prediction system comprises a prediction module configured to analyze a current draw associated with a digital media drive measured at least two different operating times of the digital media drive to automatically determine whether a different between the measured current draws indicates an impending failure of the digital media drive.
摘要:
A digital media drive failure prediction system comprises a prediction module configured to analyze a current draw associated with a digital media drive measured at least two different operating times of the digital media drive to automatically determine whether a different between the measured current draws indicates an impending failure of the digital media drive.
摘要:
A computer fan efficiency feedback system and method are presented. In one embodiment, an indication electronic components are operating is received. A cooling system is directed to provide air flow to the electronic components. In one exemplary implementation the cooling system includes a fan. The fan speed is modulated in accordance with a fan speed efficiency control plan. For example, the fan speed efficiency control plan includes directions for changing or modulating the fan speed to a value that maximizes an efficiency ratio of flow work to input power supplied to the fan.
摘要:
An assembly comprising a heat generating electronic device and a heat sink is provided with an intermediate gradient region between them. This intermediate region comprises a material having a coefficient of thermal expansion substantially matching the coefficient of thermal expansion of the heat generating electronic device, and a thermal conductivity greater than the thermal conductivity of the electronic device but less than the thermal conductivity of the heat sink. Provision of this intermediate layer substantially reduces stress on the electronic device caused by thermal cycling.
摘要:
In the production of micron-size pyramid emitters for field emission devices, a first layer of electrically-conductive material, such as single crystal silicon or metal, is etched to form column-like structures each of which tapers from each end of the column towards an intermediate portion along its length. A second conductive layer is formed in contact with the free ends of the columns, and etching of the columns is then resumed until the intermediate portion of each column is etched through, leaving a pair of pyramid emitters pointing towards one another and supported by the respective conductive layer.
摘要:
In a method for managing a facility that is to receive resources from a first resource supply, a supply of resources available from the first resource supply is predicted for a predetermined period of time. In addition, a demand for resources in the facility during the predetermined period of time is predicted. A capacity schedule for the facility is planned to meet a predefined operational goal, in which the plan of the capacity schedule uses as inputs, the predicted supply of resources available from the first resource supply and the predicted demand for resources in the facility during the predetermined period of time. Moreover, a determination as to whether the planned capacity schedule meets the predefined operational goal is made.
摘要:
A system for managing distribution of a cooling medium includes a sensor configured to detect a condition, a first agent configured to receive the detected condition and to determine whether a characteristic of the cooling medium controlled via a first actuator is to be manipulated based upon the detected condition. The system also includes a second agent configured to receive at least one of the detected condition and the flow manipulation determination of the first actuator and to determine whether a characteristic of the cooling medium controlled by a second actuator is to be manipulated based upon the at least one of the detected condition and the characteristic manipulation determination of the first actuator.
摘要:
Data points contain data values in respective time intervals. Pixels representing data points for time periods (each time period including multiple time intervals) are placed in corresponding discrete rings in a graphical visualization, wherein the pixels are user accessible to allow viewing of information of the corresponding data points. The pixels are temporally aligned in the corresponding discrete rings, and the pixels in the corresponding discrete rings are variably sized depending on a number of data points in the respective time periods.