摘要:
A method for real-time server management may include determining a server architecture model based on performance characteristics of a component of a server. The method may further include determining a real-time model of the server from the server architecture model based on real-time server operation data, and adapting a performance controller for the server to operational characteristics of the server based on the real-time model.
摘要:
A power capping system (10) and method (200) are provided. In one embodiment, a power capping system (10) includes a power controller (16) configured to calculate an error between a predefined maximum desired power and a power feedback signal associated with actual power consumption of a server (12) and to provide a power capping signal that substantially limits the power consumption of the server (12) based on a predetermined gain constant and the error. The system also includes a management interface (18) configured to generate a normalization factor based on the power feedback signal. The normalization factor can be implemented to normalize the error.
摘要:
A power capping system (10) and method (200) are provided. In one embodiment, a power capping system (10) includes a power controller (16) configured to calculate an error between a predefined maximum desired power and a power feedback signal associated with actual power consumption of a server (12) and to provide a power capping signal that substantially limits the power consumption of the server (12) based on a predetermined gain constant and the error. The system also includes a management interface (18) configured to generate a normalization factor based on the power feedback signal. The normalization factor can be implemented to normalize the error.
摘要:
In a method for supplying a resource to an entity from a resource actuator, a plurality of physics-based models pertaining to the resource actuator and the entity are developed, a condition detected at the entity is received, feedback control on a resource demand of the entity employed based upon the detected condition, feed forward control on the resource demand of the entity is employed based upon the detected condition and the plurality of physics-based models, a constraint optimization problem having an objective function and at least one constraint using the plurality of physics-based models is formulated, a solution to the constraint optimization problem is determined, in which the solution provides the actuator setting, and the resource actuator is set to the actuator setting to supply the entity with the resource from the resource actuator.
摘要:
A plurality of data flows can be routed from a first node of the network to one or more other nodes of the network. A destination of a data packet for each data flow is determined. When the destination node of the data packet of that data flow is not adjacent to the first node, a probabilistic determination is made for a next hop of data packets of that data flow. When the destination node of the data packet of that data flow is adjacent to the first node, a priority designation is made for the next hop of data packets of that data flow as being the destination node. The next hop for data packets of the data flow is determined based on either the probabilistic determination or the priority designation.
摘要:
In a method for manipulating environmental conditions in an infrastructure containing one or more adaptive vent tiles, correlations between opening levels of the one or more adaptive vent tiles and an environmental condition at one or more heat dissipating devices are identified. In addition, one or more environmental conditions at locations proximate to or within the one or more heat dissipating devices are received and errors between the received one or more environmental conditions and one or more reference environmental conditions are identified. Moreover, opening levels for the one or more adaptive vent tiles are determined based upon the identified correlations and errors.
摘要:
A control system for controlling resource entitlement for a resource compartment in a resource-on-demand system includes nested loops. An inner loop includes an adaptive feedback control system including an adaptive controller operable to automatically determining a gain for the control system. The gain varies depending on a demand of the resource compartment in a previous interval, and the adaptive controller is operable to determine a resource entitlement for the resource compartment for a current interval based on the gain and a target utilization for the current interval. An outer loop includes a feedback control system operable to automatically determine the target utilization for the current interval, wherein the target utilization varies based on at least one QoS metric measured for the previous interval and a QoS metric target.
摘要:
Embodiments of the present invention pertain to dynamically resizing a virtual machine container. According to one embodiment, an optimal utilization is determined based on a desired performance for a multi-tiered application and transaction mix information that describes a mix of transactions that result from executing the multi-tiered application. Automatic modification of an amount of a physical resource a virtual machine container is entitled to for executing a particular application component associated with the multi-tiered application is enabled where the amount is automatically modified based on the optimal utilization.
摘要:
A data center workload distribution management system includes a cooling cost engine to determine a cooling cost or cooling capacity for each of a plurality of zones of a data center and a workload distribution engine. The workload distribution engine is to identify the zone that has a lowest cooling cost and sufficient cooling capacity and also has sufficient processing capacity for a workload, determine a local cooling efficiency index for at least one location within the identified zone, and distribute the workload to the location having a local cooling efficiency index that indicates the highest cooling efficiency.
摘要:
In a method for managing a facility that is to receive resources from a first resource supply, a supply of resources available from the first resource supply is predicted for a predetermined period of time. In addition, a demand for resources in the facility during the predetermined period of time is predicted. A capacity schedule for the facility is planned to meet a predefined operational goal, in which the plan of the capacity schedule uses as inputs, the predicted supply of resources available from the first resource supply and the predicted demand for resources in the facility during the predetermined period of time. Moreover, a determination as to whether the planned capacity schedule meets the predefined operational goal is made.