METHOD FOR PROVIDING A SYSTEM ON CHIP WITH POWER AND BODY BIAS VOLTAGES
    1.
    发明申请
    METHOD FOR PROVIDING A SYSTEM ON CHIP WITH POWER AND BODY BIAS VOLTAGES 审中-公开
    提供功率和体积偏置电压芯片系统的方法

    公开(公告)号:US20130057334A1

    公开(公告)日:2013-03-07

    申请号:US13669259

    申请日:2012-11-05

    CPC classification number: H03K19/0016 H03K19/0013 H03K2217/0018

    Abstract: Embodiments described in the present disclosure relate to a method for providing power for an integrated system, including acts of: providing the system with power, ground and body bias voltages, the body bias voltages comprising a body bias voltage of p-channel MOS transistors, greater or lower than the supply voltage, and a body bias voltage of n-channel MOS transistors, lower or greater than the ground voltage, selecting by means of the system out of the voltages provided, depending on whether a processing unit of the system is in a period of activity or inactivity, voltages to be supplied to bias the bodies of the MOS transistors of the processing unit, and providing the bodies of the MOS transistors of the processing unit with the voltages selected.

    Abstract translation: 本公开中描述的实施例涉及一种用于为集成系统提供电力的方法,包括以下动作:向系统提供电源,接地和体偏置电压,体偏置电压包括p沟道MOS晶体管的体偏置电压, 大于或低于电源电压,以及n沟道MOS晶体管的体偏置电压低于或大于接地电压,根据系统的处理单元是否由系统提供的电压进行选择 在活动或不活动的时段期间,提供用于偏置处理单元的MOS晶体管的主体的电压,以及为处理单元的MOS晶体管的主体提供所选择的电压。

    Power management circuit for a self-powered sensor
    5.
    发明授权
    Power management circuit for a self-powered sensor 有权
    用于自供电传感器的电源管理电路

    公开(公告)号:US09557805B2

    公开(公告)日:2017-01-31

    申请号:US14279514

    申请日:2014-05-16

    CPC classification number: G06F1/3293 H02J7/35

    Abstract: A power management circuit including, between a first terminal intended to be connected to an electric power generation source and a second terminal intended to be connected to a load to be powered, a linear regulator and a circuit capable of activating the linear regulator when the power supplied by said source is greater than a first threshold.

    Abstract translation: 一种电力管理电路,包括在要连接到发电源的第一端子和旨在连接到要供电的负载的第二端子之间,线性调节器和能够在所述电力的情况下启动所述线性调节器的电路 由所述源提供的大于第一阈值。

    Adaptive multi-stage slack borrowing for high performance error resilient computing
    6.
    发明授权
    Adaptive multi-stage slack borrowing for high performance error resilient computing 有权
    用于高性能错误弹性计算的自适应多级松弛借贷

    公开(公告)号:US08994416B2

    公开(公告)日:2015-03-31

    申请号:US14045642

    申请日:2013-10-03

    CPC classification number: H03K3/02 H03K3/0375

    Abstract: Adaptive scaling digital techniques attempt to place the system close to the timing failure so as to maximize energy efficiency. Rapid recovery from potential failures is usually by slowing the system clock and/or providing razor solutions (instruction replay.) These techniques compromise the throughput. This application presents a technique to provide local in-situ fault resilience based on dynamic slack borrowing. This technique is non-intrusive (needs no architecture modification) and has minimal impact on throughput.

    Abstract translation: 自适应缩放数字技术试图使系统接近定时故障,以最大限度地提高能量效率。 潜在故障的快速恢复通常是通过减慢系统时钟和/或提供剃须刀解决方案(指令重放)。这些技术会损害吞吐量。 该应用提出了一种基于动态松弛借贷提供本地原位故障恢复能力的技术。 这种技术是非侵入式的(不需要架构修改),对吞吐量影响最小。

    Method and Device for use with Analog to Digital Converter
    7.
    发明申请
    Method and Device for use with Analog to Digital Converter 有权
    用于模数转换器的方法和装置

    公开(公告)号:US20140232575A1

    公开(公告)日:2014-08-21

    申请号:US14179993

    申请日:2014-02-13

    CPC classification number: H03M1/0624 H03M1/00 H03M1/12 H03M1/1215 H03M1/1225

    Abstract: According to one mode of implementation, a method includes an estimation including on the one hand a correlation processing involving at least one part of the sampled signal, at least one part of at least one first signal gleaned from a derived signal representative of a temporal derivative of the sampled signal and at least one part of N partial filtered signals respectively representative of N weighted differences between N pairs of bracketing versions flanking the sampled signal, N being greater than or equal to 1. On the other hand, the estimation includes a matrix processing on the results of this correlation processing. Correction processing of the M−1 trains involves respectively M−1 second signals gleaned from the derived signal and the suite of M−1 shift coefficients.

    Abstract translation: 根据一种实施方式,一种方法包括估计,其一方面包括涉及采样信号的至少一部分的相关处理,从代表时间导数的导出信号中收集的至少一个第一信号的至少一部分 的采样信号和N个部分滤波信号的至少一部分,分别代表在采样信号侧翼的N对包围版本之间的N个加权差,N大于或等于1.另一方面,估计包括矩阵 对该相关处理的结果进行处理。 M-1列车的校正处理涉及从派生信号和一组M-1移位系数收集的M-1个第二信号。

Patent Agency Ranking