摘要:
Systems and methods for separating mine tailings from water-absorbing polymers and regenerating the separated water-absorbing polymers. The systems and methods include a separation assembly that is configured to receive an augmented mine tailings slurry that includes mine tailings, water, and a swollen water-absorbing polymer. The separation assembly separates the swollen water-absorbing polymer from the augmented mine tailings slurry to produce a dewatered mine tailings slurry. The systems and methods further include a water-absorbing polymer regeneration unit that is configured to receive the swollen water-absorbing polymer. The water-absorbing polymer regeneration unit at least partially releases water from the swollen water-absorbing polymer to produce a regenerated water-absorbing polymer, and as a separate output or product, the released water.
摘要:
A system for distributing electrical current to a plurality of loads includes a first sensor coupled to an input of a protection zone for measuring a first current entering the protection zone, wherein the protection zone includes at least a portion of an electrical distribution feeder. The system also includes a second sensor coupled to an output of the protection zone for measuring a second current exiting the protection zone, and a processor coupled to the first sensor and to the second sensor. The processor is programmed to receive measurements representative of the first current and the second current, and calculate a reactive current differential of the protection zone based on the first current and the second current. The processor is also programmed to compare the reactive current differential with a fault threshold, and generate an error notification if the reactive current differential is greater than the fault threshold.
摘要:
A power delivery system includes at least one conductor having a first end and a second end and a phasor measurement unit (PMU) coupled to the first end of the conductor. The PMU is configured to obtain phasor data at the first end and generate a phasor signal that includes the phasor data. The power delivery system also includes a power generation system coupled to the second end of the conductor and configured to provide power to the conductor. The power generation system includes a power source, a power converter, and a controller. The controller is communicatively coupled to the PMU and is configured to receive the phasor signal and control the power converter based at least partially on the phasor data.
摘要:
An electric distribution system includes at least one feeder and a protection and control system. The feeder includes at least one segment including a first end and an opposing second end. The protection and control system includes a protective device and an electric current measuring device coupled to the segment proximate each end. The system further includes at least one processor coupled in communication with the electric current measuring devices. The at least one processor is programmed to determine a difference between a synchronized first electric current measured proximate the first end and a synchronized second electric current measured proximate the opposing second end and determine a switching condition of the protective devices as a function of the difference between the synchronized first and second electric currents.
摘要:
Systems and methods for dewatering mine tailings. The systems and methods include distributing a slurry of high permeability material on a sloped surface to define a high permeability layer and subsequently distributing a slurry of low permeability mine tailings on the high permeability layer to define a low permeability layer that is vertically above and in contact with the high permeability layer. The sloped surface defines a non-zero surface grade, and natural slopes of both the slurry of high permeability material and the slurry of low permeability mine tailings are within a threshold grade difference of the surface grade. In some embodiments, the systems and methods may include augmenting the slurry of high permeability material and/or augmenting the slurry of low permeability mine tailings to adjust the natural slope thereof.
摘要:
Certain embodiments of the invention may include systems, methods, and apparatus for controlling voltage and reactive power in a distribution network. One method includes estimating at least one present state associated with a distribution network; allocating one or more load zones in the distribution network; predicting load profiles of each zone for a predetermined time period; determining capacitor bank switching schedules for a predetermined time period based at least in part on the at least one present state and the predicted load profiles; and switching capacitor banks according to the capacitor bank switching schedules.
摘要:
Certain embodiments of the invention may include systems and methods for accelerating volt/VAR load flow optimization. According to an example embodiment of the invention, a method is provided for accelerating load flow for integrated volt/var control (IVVC) optimization. The method can include evaluating load flow on lines of an electrical network, identifying combinable network lines, combining the identified combinable network nodes to reduce network complexity, and determining load flow optimization for IVVC based at least in part on the reduced complexity network.
摘要:
An electric distribution system includes at least one feeder and a protection and control system. The feeder includes at least one segment including a first end and an opposing second end. The protection and control system includes a protective device and an electric current measuring device coupled to the segment proximate each end. The system further includes at least one processor coupled in communication with the electric current measuring devices. The at least one processor is programmed to determine a difference between a synchronized first electric current measured proximate the first end and a synchronized second electric current measured proximate the opposing second end and determine a switching condition of the protective devices as a function of the difference between the synchronized first and second electric currents.
摘要:
A method of load forecasting for a present day includes obtaining past observed load values of at least three earlier days and identifying a relationship between the present day's load forecast and the past observed load values including unknown weights associated with the past observed load values. The values of unknown weights are determined by comparing at least one previous day's load forecast with the observed load value of the at least one previous day. The determined weight values are then used in the relationship between the present day's load forecast and the past observed load values to forecast the present day's load.
摘要:
A method for determining a voltage level across an electrical circuit of a powertrain includes measuring a plurality of voltage levels and utilizing a comparison test between at least two voltage levels of the plurality of voltage levels to determine the circuit voltage level.