公开(公告)号:US09951601B2
公开(公告)日:2018-04-24
申请号:US14466750
申请日:2014-08-22
发明人: Kashif Rashid , David John Rossi
CPC分类号: E21B47/0007 , E21B43/121 , E21B43/122
摘要: A method, apparatus, and program product perform lift optimization in a field with a plurality of wells, with each well including an artificial lift mechanism controlled by an associated well controller. In a central controller, a network simulation model functioning as a proxy of the field is accessed to determine an optimal allocation solution for the field, and a well-specific control signal is generated for each of the plurality of wells based upon the determined optimal allocation solution. The well-specific control signal for each of the plurality of wells is communicated to the associated well controller to cause the associated well controller to control a lift parameter associated with the artificial lift mechanism for the well.
-
公开(公告)号:US20160326845A1
公开(公告)日:2016-11-10
申请号:US15109671
申请日:2015-01-06
摘要: Managing oilfield operations include obtaining a subsurface model including a fracture design model having an fracture property with an uncertain value. A set of representative values that represent uncertainty in the fracture property is obtained and used to solve an oilfield optimization problem with a control variable to obtain a solution. The solution includes an optimal value for the control variable. Based on the solution, an oilfield design is generated and stored.
摘要翻译: 管理油田作业包括获得地下模型,包括具有不确定值的断裂特性的断裂设计模型。 获得代表断裂性质不确定性的一组代表性值,并用于解决具有控制变量的油田优化问题以获得解决方案。 该解决方案包含控制变量的最优值。 基于该解决方案,生成并存储油田设计。
-
公开(公告)号:US20140094974A1
公开(公告)日:2014-04-03
申请号:US14038859
申请日:2013-09-27
发明人: Kashif Rashid
IPC分类号: G05D7/06
CPC分类号: G05D7/0617 , E21B43/12 , E21B43/30 , G05D7/0682
摘要: A method can include selecting two control variables for a fluid production network; providing data acquired from the production network, the data associated with values for the two control variables; providing an interpolation model for interpolating the data over a domain defined by operational bounds for each of the two control variables; and solving a programming problem based at least in part on the interpolation model to provide values for at least one of the two control variables. Various other apparatuses, systems, methods, etc., are also disclosed.
摘要翻译: 一种方法可以包括为流体生产网络选择两个控制变量; 提供从生产网络获得的数据,与两个控制变量的值相关联的数据; 提供插值模型,用于在由两个控制变量中的每一个的操作界限定义的域上内插数据; 以及至少部分地基于所述插值模型来解决编程问题,以提供所述两个控制变量中的至少一个的值。 还公开了各种其它装置,系统,方法等。
-
公开(公告)号:US11321788B2
公开(公告)日:2022-05-03
申请号:US16166267
申请日:2018-10-22
发明人: Virgile Galle , Kashif Rashid , Peter Tilke
摘要: Systems and methods for optimizing oilfield rig fleet scheduling and deployment are disclosed. Wells are identified to have time constraints by which they are grouped into “ON”, “BY”, and “ADD” categories. ON wells have a beginning drilling availability window; BY wells have an ending drilling availability time only; and ADD wells have no beginning or ending time of drilling availability. The systems and methods optimize scheduling with ON wells having higher priority than BY wells, and BY wells having higher priority than ADD wells.
-
公开(公告)号:US20210198988A1
公开(公告)日:2021-07-01
申请号:US16727718
申请日:2019-12-26
摘要: Methods and systems are provided for controlling gas lift in at least one production well, which determine a quadratic function that relates flow rate or value of oil produced from a production well to gas flow rate for gas injected into the production well based on flow rate measurements for gas injected into the production well and corresponding flow rate measurements of oil produced from the production well. The quadratic function is used to determine an optimal flow rate for gas injected into the production well. The optimal flow rate for gas injected into the production well is used to control the flow rate of gas injected into the production well, and an oil flow rate produced from the production well is measured at the optimal gas flow rate for iterative processing to refine the quadratic function and determination of optimal gas flow rate if need be.
-
公开(公告)号:US10767448B2
公开(公告)日:2020-09-08
申请号:US15109671
申请日:2015-01-06
IPC分类号: G06G7/48 , E21B41/00 , E21B43/00 , G06Q10/06 , G06F30/20 , E21B43/26 , E21B43/267 , E21B47/00 , E21B49/00 , G05B13/04 , G06Q50/02 , G06G7/50 , G06N3/04 , H04W16/12 , G06F30/00 , G06F111/06
摘要: Managing oilfield operations include obtaining a subsurface model including a fracture design model having an fracture property with an uncertain value. A set of representative values that represent uncertainty in the fracture property is obtained and used to solve an oilfield optimization problem with a control variable to obtain a solution. The solution includes an optimal value for the control variable. Based on the solution, an oilfield design is generated and stored.
-
公开(公告)号:US10690131B2
公开(公告)日:2020-06-23
申请号:US15546227
申请日:2016-01-22
发明人: Kashif Rashid , Sandeep Verma , Kim Hodgson
IPC分类号: E21B43/26 , F04B49/06 , F04B23/04 , F04B11/00 , F04B53/00 , F04B15/02 , E21B33/13 , F04B49/20 , F04B51/00
摘要: A technique for reducing harmonic vibration in a multiplex multi-pump system. The technique includes establishing a lower bound of system specific vibration-related information such as via pressure variation or other vibration indicator. Establishing the lower bound may be achieved through simulation with the system or through an initial sampling period of pump operation. During this time, random perturbations through a subset of the pumps may be utilized to disrupt timing or phase of the subset. Thus, system vibration may randomly increase or decrease upon each perturbation. Regardless, with a sufficient number of sampled perturbations, the lower bound may be established. Therefore, actual controlled system operations may proceed, again employing random perturbations until operation of the system close to the known lower bound is substantially attained.
-
公开(公告)号:US10443358B2
公开(公告)日:2019-10-15
申请号:US15014869
申请日:2016-02-03
发明人: Kashif Rashid , David John Rossi
摘要: A method, apparatus, and computer readable storage medium perform oilfield-wide optimization in a field with a plurality of wells, with each well including a well flow rate management mechanism controlled by an associated well controller. In a central controller, a network simulation model functioning as a proxy of the field is accessed to determine an optimal allocation solution for the field, and a well-specific control signal is generated for each of the plurality of wells based upon the determined optimal allocation solution. The well-specific control signal for each of the plurality of wells is communicated to cause the associated well controller to control a flow rate management parameter associated with the well flow rate management mechanism for the well.
-
公开(公告)号:US20170336811A1
公开(公告)日:2017-11-23
申请号:US15156573
申请日:2016-05-17
CPC分类号: E21B41/0092 , E21B43/12
摘要: A method, apparatus, and program product generate a flow control device design for well completions in one or more wells of an oilfield in part by equipping a reservoir simulation model with multiple flow control device proxies represented by one or more generalized expressions for pressure drop including multiple tunable parameters associated with various physical flow control devices. Multiple reservoir simulations are then run using the reservoir simulation model to optimize an objective function based on at least a subset of the tunable parameters such that an optimal set of values determined from the optimization may be used to select flow control device types for the well completions.
-
公开(公告)号:US20160153266A1
公开(公告)日:2016-06-02
申请号:US15014869
申请日:2016-02-03
发明人: Kashif Rashid , David John Rossi
CPC分类号: E21B41/0092 , E21B43/121 , E21B43/122 , E21B47/00 , F04B47/02 , F04B49/065 , G05D7/0635
摘要: A method, apparatus, and computer readable storage medium perform oilfield-wide optimization in a field with a plurality of wells, with each well including a well flow rate management mechanism controlled by an associated well controller. In a central controller, a network simulation model functioning as a proxy of the field is accessed to determine an optimal allocation solution for the field, and a well-specific control signal is generated for each of the plurality of wells based upon the determined optimal allocation solution. The well-specific control signal for each of the plurality of wells is communicated to cause the associated well controller to control a flow rate management parameter associated with the well flow rate management mechanism for the well.
摘要翻译: 方法,装置和计算机可读存储介质在具有多个井的现场中进行油田范围优化,其中每个井包括由关联的井控制器控制的井流量管理机构。 在中央控制器中,访问用作该场的代理的网络模拟模型以确定用于该场的最佳分配解决方案,并且基于所确定的最佳分配为多个井中的每一个产生特定于井的控制信号 解。 通信用于多个井中的每一个的井具体的控制信号以使相关的井控制器控制与井的井流量管理机构相关联的流量管理参数。
-
-
-
-
-
-
-
-
-