-
公开(公告)号:US11009932B2
公开(公告)日:2021-05-18
申请号:US16370930
申请日:2019-03-30
Applicant: Intel Corporation
Inventor: Chee Lim Nge , James Hermerding, II , Zhongsheng Wang , Pranava Alekal
IPC: G06F1/00 , G06F1/26 , G06F1/3203 , H04W92/18
Abstract: Described are mechanisms and methods for implementing highly configurable power delivery management policies. An apparatus may comprise a first circuitry, a second circuitry, a third circuitry, and a fourth circuitry. The first circuitry may include a memory to store a first table having one or more first entries and to store a second table having one or more respectively corresponding second entries. The second circuitry may, upon the occurrence of an event, test a condition specified by an entry in the first table. The third circuitry may, upon the test of the condition having a positive result, evaluate a set of one or more parameters as specified by an entry in a second table corresponding with the entry in the first table. The fourth circuitry may initiate a power-management action based upon the evaluation of the set of one or more parameters.
-
公开(公告)号:US20210109578A1
公开(公告)日:2021-04-15
申请号:US17068709
申请日:2020-10-12
Applicant: Intel Corporation
Inventor: Ashwin Umapathy , Chee Lim Nge , Timothy Smith , Dmitriy Berchanskiy , Vinay Raghav
IPC: G06F1/26
Abstract: Three components are used to adjust the CPU peak power based on the USB TYPE-C device states. These components include operating system (OS) Peak Power Manager, USB TYPE-C Connector Manager, and USB TYPE-C Protocol Device Driver. The USB TYPE-C Connector Manager sends a synchronous request to the OS Peak Power Manager when a USB TYPE-C power sink device is attached or detached, and the USB TYPE-C Protocol Device Driver sends a synchronous request to the Peak Power Manager when the power sink transitions device state. The Peak Power Manager takes power budget from the CPU when the USB TYPE-C connector is attached to a power sink and is active (e.g., high power device state), and gives back the power budget to the CPU for performance when the USB TYPE-C connector is either detached or the attached and power sink device is idle (lowest device state).
-
公开(公告)号:US20200341530A1
公开(公告)日:2020-10-29
申请号:US16927649
申请日:2020-07-13
Applicant: Intel Corporation
Inventor: Chee Lim Nge , Eugene Gorbatov , Zhongsheng Wang , James G. Hermerding, II , Basavaraj B. Astekar , Jenn Chuan Cheng , Chia-Hung Sophia Kuo , Ashwin Umapathy , Tin-Cheung Kung , Yifan Li , Alexander B. Uan-Zo-Li
IPC: G06F1/324 , G06F1/3287 , G06F13/38 , G06F13/42 , G06F1/26
Abstract: When power is provided through a USB-C cable from a source device to a sink device, a sudden connection or disconnection of the cable between the two devices may cause a sudden power surge or power drop in at least one of those devices, leading to other problems. To avoid this sudden event from causing potential damage or disruption to one of the devices, in some embodiments a CC pin in the cable is used to announce the impending connection/disconnection, and the device may throttle back its power consumption before power is actually applied to or removed from the power pins.
-
44.
公开(公告)号:US20200326994A1
公开(公告)日:2020-10-15
申请号:US16914177
申请日:2020-06-26
Applicant: Intel Corporation
Inventor: Carin Ruiz , Bo Qiu , Columbia Mishra , Arijit Chattopadhyay , Chee Lim Nge , Srikanth Potluri , Jianfang Zhu , Deepak Samuel Kirubakaran , Akhilesh Rallabandi , Mark Gallina , Renji Thomas , James Hermerding II
Abstract: Methods, apparatus, and systems to dynamically schedule a workload to among compute blocks based on temperature are disclosed. An apparatus to schedule a workload to at least one of a plurality of compute blocks based on temperature includes a prediction engine to determine (i) a first predicted temperature of a first compute block of the plurality of compute blocks and (ii) a second predicted temperature of a second compute block of the plurality of compute blocks. The apparatus also includes a selector to select between the first compute block and the second compute block for assignment of the workload. The selection is based on which of the first and second predicted temperatures is lower. The apparatus further includes a workload scheduler to assign the workload to the selected one of the first or second compute blocks.
-
公开(公告)号:US10712801B2
公开(公告)日:2020-07-14
申请号:US15639447
申请日:2017-06-30
Applicant: Intel Corporation
Inventor: Chee Lim Nge , Eugene Gorbatov , Zhongsheng Wang , James G. Hermerding, II , Basavaraj B. Astekar , Jenn Chuan Cheng , Chia-Hung Sophia Kuo , Ashwin Umpathy , Tin-Cheung Kung , Yifan Li , Alexander B. Uan-Zo-Li
IPC: G06F1/324 , G06F1/3287 , G06F13/38 , G06F13/42 , G06F1/26 , G06F1/3296 , G06F1/3215 , G06F13/40
Abstract: When power is provided through a USB-C cable from a source device to a sink device, a sudden connection or disconnection of the cable between the two devices may cause a sudden power surge or power drop in at least one of those devices, leading to other problems. To avoid this sudden event from causing potential damage or disruption to one of the devices, in some embodiments a CC pin in the cable is used to announce the impending connection/disconnection, and the device may throttle back its power consumption before power is actually applied to or removed from the power pins.
-
公开(公告)号:US10552364B2
公开(公告)日:2020-02-04
申请号:US16363851
申请日:2019-03-25
Applicant: INTEL CORPORATION
Inventor: Chee Lim Nge , Basavaraj B. Astekar , Jenn Chuan Cheng
IPC: G06F13/42 , G06F1/26 , G06F1/3287
Abstract: In some examples, a power delivery system includes a primary power path to provide power to a computing system. The power delivery system also includes a bypass power path. A port manager is to disable the primary power path and to enable the bypass power path in response to a dead battery condition.
-
47.
公开(公告)号:US10476283B2
公开(公告)日:2019-11-12
申请号:US14040278
申请日:2013-09-27
Applicant: INTEL CORPORATION
Inventor: Patrick K. Leung , Chee Lim Nge , Tod F. Schiff
IPC: H02J7/00
Abstract: A bi-directional charger may be provided that includes a logic, at least a portion of which is hardware, to determine an operational mode based at least on a characteristic at a battery port or at a charge port, and to control power flow between the charge port and the battery port based on the determined operational mode.
-
公开(公告)号:US20190004584A1
公开(公告)日:2019-01-03
申请号:US15639447
申请日:2017-06-30
Applicant: Intel Corporation
Inventor: Chee Lim Nge , Eugene Gorbatov , Zhongsheng Wang , James G. Hermerding, II , Basavaraj B. Astekar , Jenn Chuan Cheng , Chia-Hung Sophia Kuo , Ashwin Umapathy , Tin-Cheung Kung , Yifan Li , Alexander B. Uan-Zo-Li
Abstract: When power is provided through a USB-C cable from a source device to a sink device, a sudden connection or disconnection of the cable between the two devices may cause a sudden power surge or power drop in at least one of those devices, leading to other problems. To avoid this sudden event from causing potential damage or disruption to one of the devices, in some embodiments a CC pin in the cable is used to announce the impending connection/disconnection, and the device may throttle back its power consumption before power is actually applied to or removed from the power pins.
-
公开(公告)号:US20180278053A1
公开(公告)日:2018-09-27
申请号:US15466498
申请日:2017-03-22
Applicant: Intel Corporation
Inventor: Alexander B. Uan-Zo-li , Eugene Gorbatov , Chee Lim Nge
CPC classification number: H02J1/00 , G01R19/16542 , G01R31/3835 , H02J1/02 , H02J7/0052 , H02J7/007 , H02J7/345
Abstract: A method and apparatus for extending peak power capability of a computing device. In one embodiment, the apparatus comprises: voltage monitoring hardware to monitor voltage being supplied by a battery to a system load; and an energy storage coupled to the voltage monitoring hardware and/or charging scheme to supplement supply of power to the system load when the voltage supplied to the system load by the battery, as monitored by the voltage monitoring hardware, drops below a first threshold voltage level, the first threshold voltage level being above a minimum voltage level associated with the computing system.
-
公开(公告)号:US20180189223A1
公开(公告)日:2018-07-05
申请号:US15396527
申请日:2016-12-31
Applicant: INTEL CORPORATION
Inventor: Chee Lim Nge , Basavaraj B. Astekar , Jenn Chuan Cheng
CPC classification number: G06F13/4282 , G06F1/263 , G06F1/266 , Y02D10/14 , Y02D10/151
Abstract: In some examples, a power delivery system includes a primary power path to provide power to a computing system. The power delivery system also includes a bypass power path. A port manager is to disable the primary power path and to enable the bypass power path in response to a dead battery condition.
-
-
-
-
-
-
-
-
-