摘要:
Arrangements reducing power consumption of an air conditioner and a storage device. A control method with a management server apparatus for a plurality of storage devices and an air conditioner includes calculating plural combinations of allocating the work amount to the plurality of storage devices, calculating the heating value of each storage device included in the plurality of storage devices for each of the plural combinations, calculating the quantity of heat conducted to the air conditioner, based on the heating value and positional information of the plurality of storage devices and the air conditioner, calculating the power consumption to cool the quantity of heat conducted to the air conditioner, selecting a combination included in the plural combinations based on the power consumption of the air conditioner, and issuing a move of the data stored in a first storage device to a second storage device, based on the selected combination.
摘要:
A power management method for an information platform, includes holding system configuration information indicating a correspondence between a logical system and a processing module constituting the logical system; holding power management information indicating a correspondence between information with which a type of the logical system can be specified, an operating condition of the logical system, and first power consumption for operating the logical system; selecting the processing module which constitutes the logical system specified by a configuration request by referring to the system configuration information when receiving the configuration request of the logical system; calculating the first power consumption for operating the logical system based on the type and the operating condition included in the configuration request, and the power management information; and determining second power consumption to be supplied to the processing module based on the calculated first power consumption and information on the processing modules.
摘要:
To improve throughput in data transfer in a remote I/O system, this invention provides a computer system including: a host computer; a device which communicates with the host computer; and a network which connects the host computer and the device, in which the device is coupled to the network via a device bridge including a bridge memory, and the host computer includes a host memory and a device driver. The device driver writes, when at least one of data and an address is written in the host memory, in the bridge memory the at least one of the data and address stored through the writing in the host memory; and sends a data transfer request to the device bridge, and the device bridge reads, upon reception of the data transfer request, an address from a predetermined area; and reads data from an area that is indicated by the read address.
摘要:
A system and method for virtualizing a new network storage additionally installed and an existing network storage as a single file system by inheriting a directories tree structure from the existing network storage, wherein a virtualizing system of the new network storage has the function of reading out setup information of the existing network storage according to an expansion request from the administrator, registering the existing network storage as a member of the virtualizing system, copying a directories tree structure of the existing network storage, and swapping setup information of the existing network storage and that of he new network storage with each other.
摘要:
Disclosed herewith is a composite type computer system that can assure that a PCI tree to be allocated to a computer is configured completely before the computer is powered. The composite type computer system includes a PCI switch that connects plural computers through PCI interfaces; plural PCI devices connected to the PCI switch; a system controller that controls the computers; and a PCI manager that controls allocation of the PCI devices to the computers. The system controller carries out processings in the steps of (a) powering an object computer to start up its OS; (b) acquiring the identifier of a PCI tree allocated by the system controller to the computer and PCI tree management information denoting the status of the PCI tree; (c) retrying the powering or canceling the powering of the computer if the acquired PCI tree management information denotes the status “not initialized”; and (d) carrying out the powering for the computer if the acquired PCI management information denotes the status “initialized”.
摘要:
To improve throughput in data transfer in a remote I/O system, this invention provides a computer system including: a host computer; a device which communicates with the host computer; and a network which connects the host computer and the device, in which the device is coupled to the network via a device bridge including a bridge memory, and the host computer includes a host memory and a device driver. The device driver writes, when at least one of data and an address is written in the host memory, in the bridge memory the at least one of the data and address stored through the writing in the host memory; and sends a data transfer request to the device bridge, and the device bridge reads, upon reception of the data transfer request, an address from a predetermined area; and reads data from an area that is indicated by the read address.
摘要:
There is a need for applying an appropriate QoS setting to a complex information platform apparatus capable of flexibly changing an apparatus configuration so as to ensure an intra-apparatus communication band and realize management communication independence. Multiple processing modules are combined to construct one or more processing units with different apparatus types. An apparatus template management table prepares multiple levels of setting specifications with different ensured bands for intra-apparatus communication corresponding to each apparatus type. One set of setting specification is selected from multiple levels of setting specifications prepared for an apparatus type settled at the time of configuration setting. A QoS setting management table is generated based on the selected setting specification. When the configuration is set or changed, setting verification means verifies whether or not a total of ensured bands associated with each adapter is within an allowable range. When a result is negative, the setting specification is automatically changed to another provided with a smaller ensured band. A verified setting is distributed from the QoS setting management table to an IO switch and each adapter.
摘要:
A method for moving files between network storages in a virtualized network storage system having multiple network storages and rebalancing the free disk spaces. It periodically judges whether to start rebalancing. Two different conditions are adopted for the determination of start: (a) an imbalance of free disk spaces and the minimum value of the free disk spaces is less than a threshold and (b) an imbalance of free disk spaces and the frequency of accesses to the system is less than a threshold. Rebalancing is performed until the difference in free disk spaces falls below the threshold without exceeding the maximum execution time of rebalancing. If a request to write into a file which is being moved from a client takes place during a file moving step, the movement of the file is aborted and the file is deleted from the destination.
摘要:
Pieces of working information on workloads, positions of the workloads, pieces of environmental information on cooling facilities, and positions of the cooling facilities are stored as arrangement information. The pieces of working information on the workloads are estimated, and allocation of tentative workloads is deduced for fear the pieces of working information may exceed the performances of a group of information processing devices. Tentative power consumptions and arrangement information resulting from the allocation of the tentative workloads, and tentative power consumptions and arrangement information necessary for the allocation of the tentative workloads are calculated. Tentative cooling powers required to control the cooling facilities are calculated. Allocation of the tentative workloads minimizing the sum total of the tentative power consumptions of the information processing devices and the tentative cooling powers of the cooling facilities is searched. Based on the searched allocation, the workloads are allocated to the information processing devices.
摘要:
Total power consumption of information-processing devices and power supply/cooling facilities is reduced to realize energy saving operation of information-processing system. The information-processing system includes information-processing devices, power supply facilities, cooling facilities and an operations management device. The operations management device is connected to the devices and the facilities and includes layout information constituted of locations and operating information of the devices and locations and environmental information of the facilities. Also, the operations management device obtains the power consumption of the devices, the power supply loss of the power supply facilities and the cooling power of the cooling facilities by using the layout information, and then allocates the workloads to the devices so as to reduce the total sum of power consumption, supply loss and cooling power.