摘要:
In a method for managing at least one three-dimensional package and a cooling system having at least one active cooling mechanism configured to cool the at least one three-dimensional package, at least one of workload on and an environmental condition on or around the at least one three-dimensional package is identified. In addition, at least one of an active cooling mechanism and a three-dimensional package is controlled based upon at least one of the identified workload and environmental condition.
摘要:
An apparatus includes a processor and a storage medium. The processor is operable to collect device data associated with the apparatus and transmit at least some of the device data to a tag.
摘要:
To provide collaborative business intelligence in an enterprise, an analytics platform is provided to receive an event associated with the enterprise and to perform analysis in response to the event. A virtual collaboration platform is provided to enable plural users to interact with each other and to use resources of the analytics platform.
摘要:
According to one embodiment, an equipment enclosure includes a plurality of equipment elements, each element having one or more heat generating sources. A heat exchanger is mounted towards the top of the equipment enclosure. The heat exchanger is thermally coupled to at least some of the heat generating sources. The enclosure includes an exhaust vent through which air heated by the heat exchanger may be evacuated, and an inlet vent through which air from outside the equipment enclosure may be drawn into the equipment enclosure to cool the heat exchanger by stack effect ventilation.
摘要:
Embodiments include methods, apparatus, and systems for analyzing data in an infrastructure. One embodiment includes a method that senses environmental data at equipment racks in an infrastructure, identifies patterns in the environmental data, and uses the patterns to modify the infrastructure to improve thermal management in the infrastructure.
摘要:
Embodiments include methods, apparatus, and systems with integrated circuits having phase change devices. One embodiment includes an integrated circuit die and a phase change die having a phase change material that changes phases when a temperature at the integrated circuit die exceeds a threshold for a predetermined amount of time.
摘要:
A virtual cooling infrastructure includes a demand manager having logical descriptions of a plurality of heat loads and the demand manager is configured to determine cooling load demands of the heat loads. The infrastructure also includes a capacity manager having logical descriptions of a plurality of cooling system components configured to supply cooling resources to cool the heat loads. The infrastructure further includes a service operator configured to map the cooling resources of the cooling system components to the cooling load demands of the heat loads.
摘要:
A projection system has at least one heat source. A closed-loop heat pipe has at least one heat receiving portion thermally coupled with the at least one heat source, and at least one heat rejecting portion thermally coupled with a heat sink. A heat carrying fluid circulating through the heat pipe receives heat from the at least one heat source and releases heat to the heat sink.
摘要:
A primary power supply and a secondary power supply are operable to supply power to at least one electrical device. A power demand of the electrical device is determined, and an efficient operating point for the primary power supply is determined. One or more of the primary power supply and the secondary power supply are used to supply power to the electrical device based on whether the primary power supply operating at an efficient operating point is operable to meet the power demand of the at least one electrical device.
摘要:
An air conditioning unit may be controlled based on an index of performance designed to quantify re-circulation levels. For the air conditioning unit control, an index of performance set point is determined and the index of performance for a first iteration is measured. In addition, it is determined whether the measured index of performance for the first iteration equals or exceeds the index of performance set point. Moreover, a supply air temperature of the air conditioning unit is increased in response to the measured index of performance for the first iteration equaling or exceeding the index of performance set point.