Turbocharger boost control systems and methods for gear shifts
    3.
    发明授权
    Turbocharger boost control systems and methods for gear shifts 有权
    涡轮增压器升压控制系统和换档方法

    公开(公告)号:US08967118B2

    公开(公告)日:2015-03-03

    申请号:US13027376

    申请日:2011-02-15

    摘要: A method includes: retarding spark timing relative to a predetermined spark timing when an engine torque output reduction is requested for a gear shift; estimating a first torque output of an engine based on N cylinders of the engine being fueled, an engine speed, an air per cylinder (APC), and the predetermined spark timing; estimating a second torque output of the engine based on M cylinders being fueled, the engine speed, the APC, and the spark timing. determining an initial pressure ratio across a turbocharger compressor; determining an adjustment based on M and the first and second torque outputs; generating a desired pressure ratio across the turbocharger compressor based on the adjustment and the initial pressure ratio; and controlling opening of a turbocharger wastegate based on the desired pressure ratio. N is a total number of cylinders of the engine and M is less than or equal to N.

    摘要翻译: 一种方法包括:当要求换档的发动机转矩输出减小时,相对于预定的火花正时延迟火花正时; 基于正在燃料的发动机的N个气缸,发动机转速,每缸气体(APC)和预定的火花正时来估计发动机的第一扭矩输出; 基于被加油的M个气缸,发动机转速,APC和火花正时来估计发动机的第二扭矩输出。 确定跨越涡轮增压器压缩机的初始压力比; 确定基于M和第一和第二扭矩输出的调整; 基于调节和初始压力比,在涡轮增压器压缩机上产生期望的压力比; 以及基于期望的压力比来控制涡轮增压器废气门的打开。 N是发动机的总气缸数,M小于或等于N.

    ALTERNATOR CONTROL SYSTEMS AND METHODS FOR VEHICLE DECELERATION
    6.
    发明申请
    ALTERNATOR CONTROL SYSTEMS AND METHODS FOR VEHICLE DECELERATION 有权
    车辆减速器的换档控制系统和方法

    公开(公告)号:US20130096810A1

    公开(公告)日:2013-04-18

    申请号:US13302532

    申请日:2011-11-22

    IPC分类号: F02D41/26 F02D28/00

    摘要: A system for a vehicle includes a fuel control module and a voltage setting module. The fuel control module cuts off fuel to an engine during a deceleration fuel cutoff (DFCO) event. During the DFCO event, the voltage setting module monitors a brake pedal position, sets a desired voltage to a first predetermined voltage when a brake pedal is not depressed, and sets the desired voltage to a second predetermined voltage when the brake pedal is depressed. The second predetermined voltage is greater than the first predetermined voltage. A regulator generates a pulse width modulation (PWM) signal based on the desired voltage and applies the PWM signal to an alternator.

    摘要翻译: 一种用于车辆的系统包括燃料控制模块和电压设定模块。 燃料控制模块在减速燃料切断(DFCO)事件期间将燃料切断到发动机。 在DFCO事件期间,电压设定模块监视制动踏板位置,当制动踏板未被按下时将所需电压设定为第一预定电压,并且当制动踏板被按下时将所需电压设定为第二预定电压。 第二预定电压大于第一预定电压。 调节器基于所需电压产生脉宽调制(PWM)信号,并将PWM信号施加到交流发电机。

    Feed-forward camshaft phaser control systems and methods
    7.
    发明授权
    Feed-forward camshaft phaser control systems and methods 有权
    前馈凸轮轴相控器控制系统和方法

    公开(公告)号:US08346447B2

    公开(公告)日:2013-01-01

    申请号:US12765304

    申请日:2010-04-22

    IPC分类号: G06F7/00

    摘要: An engine control system includes an inertia phase detection module, a feed-forward (FF) engine speed module, a FF APC module, a FF phaser position module, and a phaser control module. The inertia phase detection module determines when an inertia phase of a gear shift is occurring within a transmission. The FF engine speed module predicts an engine speed for a future time when the inertia phase ends. The FF APC module predicts an air-per-cylinder (APC) for the future time based on the engine speed. The FF phaser position module determines a FF phaser position based on the engine speed and the APC. The phaser control module controls a camshaft phaser position based on the FF phaser position during the inertia phase of the gear shift.

    摘要翻译: 发动机控制系统包括惯性相位检测模块,前馈(FF)发动机转速模块,FF APC模块,FF相位器模块和相位器控制模块。 惯性相位检测模块确定变速器内的变速惯性阶段何时发生。 当惯性阶段结束时,FF发动机转速模块预测未来时间的发动机转速。 FF APC模块基于发动机转速预测未来时间的每缸气体(APC)。 FF移相器位置模块基于发动机速度和APC确定FF相位器位置。 移相器控制模块在变速惯性阶段基于FF相位器位置控制凸轮轴相位器位置。

    TURBOCHARGER BOOST CONTROL SYSTEMS AND METHODS FOR GEAR SHIFTS
    10.
    发明申请
    TURBOCHARGER BOOST CONTROL SYSTEMS AND METHODS FOR GEAR SHIFTS 有权
    涡轮增压器控制系统和齿轮换档方法

    公开(公告)号:US20120180759A1

    公开(公告)日:2012-07-19

    申请号:US13027376

    申请日:2011-02-15

    IPC分类号: F02P5/04

    摘要: A method includes: retarding spark timing relative to a predetermined spark timing when an engine torque output reduction is requested for a gear shift; estimating a first torque output of an engine based on N cylinders of the engine being fueled, an engine speed, an air per cylinder (APC), and the predetermined spark timing; estimating a second torque output of the engine based on M cylinders being fueled, the engine speed, the APC, and the spark timing. determining an initial pressure ratio across a turbocharger compressor; determining an adjustment based on M and the first and second torque outputs; generating a desired pressure ratio across the turbocharger compressor based on the adjustment and the initial pressure ratio; and controlling opening of a turbocharger wastegate based on the desired pressure ratio. N is a total number of cylinders of the engine and M is less than or equal to N.

    摘要翻译: 一种方法包括:当要求换档的发动机转矩输出减小时,相对于预定的火花正时延迟火花正时; 基于正在燃料的发动机的N个气缸,发动机转速,每缸气体(APC)和预定的火花正时来估计发动机的第一扭矩输出; 基于被加油的M个气缸,发动机转速,APC和火花正时来估计发动机的第二扭矩输出。 确定跨越涡轮增压器压缩机的初始压力比; 确定基于M和第一和第二扭矩输出的调整; 基于调节和初始压力比,在涡轮增压器压缩机上产生期望的压力比; 以及基于期望的压力比来控制涡轮增压器废气门的打开。 N是发动机的总气缸数,M小于或等于N.