METHOD OF MANUFACTURING A COMPONENT CARRIER USING A SEPARATION COMPONENT, THE COMPONENT CARRIER, AND A SEMI-FINISHED PRODUCT

    公开(公告)号:EP3657915A3

    公开(公告)日:2020-11-18

    申请号:EP19209423.3

    申请日:2019-11-15

    摘要: A method of manufacturing a first component carrier (100a) and a second component carrier (100b), the method comprising: i) providing a separation component (150) comprising a first separation surface (151) and a second separation surface (152) being opposed to the first separation surface (151), ii) coupling a first base structure (110) having a first cavity (111) with the first separation surface (151), iii) coupling a second base structure (120) having a second cavity (121) with the second separation surface (152), iv) placing a first electronic component (115) in the first cavity (111), v) connecting the first base structure (110) with the first electronic component (115) to form the first component carrier (100a), vi) placing a second electronic component (125) in the second cavity (112), vii) connecting the second base structure (120) with the second electronic component (125) to form the second component carrier (100b), viii) separating the first component carrier (100a) from the first separation surface (151) of the separation component (150), and ix) separating the second component carrier (100b) from the second separation surface (152) of the separation component (150).

    METHOD FOR ALLOCATING RESOURCES TO MACHINES OF A PRODUCTION FACILITY

    公开(公告)号:EP4053657A1

    公开(公告)日:2022-09-07

    申请号:EP22160240.2

    申请日:2022-03-04

    摘要: A method for allocating resources (104) to machines (102) of a production facility (100) comprises: receiving forecast data (204) indicating planned demands (214) for the resources (104) and a demand deviation (216) for each resource (104); generating a new demand (220) for each resource (104) from the planned demand (214) and the demand deviation (216) of the resource (104) in several iterations; assigning capacities to the new demands (220) in each iteration by determining resource-machine combinations (106), wherein a priority is determined for each resource (104) and each machine (102) based on a set of priority rules (226; 226a, 226b, 226c, 226d, 226e), wherein the resource-machine combinations (106) are determined by combining the resources (104) and the machines (102) according to the priorities; and generating a roll-out plan (228) assigning resource-machine combinations (106) to be rolled out to future time periods, wherein the roll-out plan (228) is generated from the resource-machine combinations (106) of different iterations and an estimated roll-out time for each resource-machine combination (106) such that a total number of the resource-machine combinations (106) to be rolled-out is minimized.

    RESOURCE ALLOCATION SYSTEM FOR MAINTAINING A PRODUCTION FACILITY

    公开(公告)号:EP4053656A2

    公开(公告)日:2022-09-07

    申请号:EP22160239.4

    申请日:2022-03-04

    IPC分类号: G05B19/418 G06Q10/06

    摘要: A resource allocation system (16) for a production facility (10) stores: a production schedule (32) assigning production tasks (34) to machines (12) of the production facility (10), each production task (34) comprising a production time window during which a machine (12) is occupied with the production task (34); a maintenance schedule (36) assigning maintenance tasks (38) to service resources (22), each maintenance task (38) comprising a maintenance time window during which a machine (12) is occupied with the maintenance task (38); and a maintenance plan (48) comprising maintenance rules (50) for generating maintenance tasks (38), the maintenance rules (50) at least comprising a scheduling rule (50a) from which a time after which a machine (12) has to be maintained is derivable. The resource allocation system (16) is configured for determining maintenance tasks (38) for machines (12) based on the maintenance rules (50), wherein the time window of a maintenance task (38) for a machine (12) is determined from a previous maintenance task (38), the scheduling rule (50a) for the machine (12) and the production tasks (34) for the machine (12), such that the time window of the maintenance task (38) does not overlap with the production tasks (34).