-
公开(公告)号:US09765800B2
公开(公告)日:2017-09-19
申请号:US14122902
申请日:2012-05-22
申请人: Chiaki Fukui
发明人: Chiaki Fukui
IPC分类号: F16J1/00 , F15B15/14 , F16J1/12 , B23K11/00 , B23K11/14 , B23K11/16 , B23K11/18 , F15B15/28 , B23K101/00 , B23K103/02 , B23K103/04 , B23K103/10
CPC分类号: F15B15/1447 , B23K11/006 , B23K11/14 , B23K11/16 , B23K11/185 , B23K2101/003 , B23K2103/02 , B23K2103/04 , B23K2103/05 , B23K2103/10 , F15B15/2807 , F16J1/008 , F16J1/12
摘要: A piston main body in a piston assembly of a fluid pressure cylinder includes a first piston member and a second piston member including a plate-shaped member. The first piston member and the second piston member are joined in a state overlapping in the axial direction of a piston rod. The second piston member is not provided with a hole that passes through in the plate thickness direction.
-
公开(公告)号:US20170259373A1
公开(公告)日:2017-09-14
申请号:US15529093
申请日:2015-11-23
申请人: Scansonic MI GmbH
发明人: Florian ALBERT , Peter FIXEMER , Igor HASCHKE , Alexander MULLER , Pravin SIEVI
IPC分类号: B23K26/044 , B23K26/242 , B23K31/12 , B23K26/03 , B23K26/082 , B23K26/046
CPC分类号: B23K26/044 , B23K26/032 , B23K26/046 , B23K26/048 , B23K26/082 , B23K26/242 , B23K31/125 , B23K2103/04 , B23K2103/10 , B23K2103/18
摘要: A method and an apparatus for joining two workpieces by means of a processing beam by forming a weld seam along a lap joint, wherein a gap formed at the lap joint between the two workpieces is filled during welding. The processing beam performs a spatial oscillatory movement parallel and/or perpendicular to the joint during welding. The oscillation parameters of said oscillation, the feed rate, the power of the processing beam and the angle of incidence of the processing beam onto the surfaces of the workpieces are adjusted dynamically during the welding process such that the upper sheet is fused in line with demand and the melt flows from the upper sheet down to the lower sheet thus closing the gap. The gap height is measured permanently during welding and the process parameters are adjusted such that a reliable closing of the gap is made possible.
-
公开(公告)号:US20170252858A1
公开(公告)日:2017-09-07
申请号:US15349914
申请日:2016-11-11
申请人: Foro Energy, Inc.
发明人: Mark S. Zediker , Daryl L. Grubb , Ronald A. De Witt , Paul D. Deutch , Joel F. Moxley , Scott A. Marshall , Eugence J. Linyaev , Sam N. Schroit , Sharath K. Kolachalam
CPC分类号: B23K26/146 , B23K26/0096 , B23K26/03 , B23K26/04 , B23K26/0622 , B23K26/0652 , B23K26/106 , B23K26/1224 , B23K26/127 , B23K26/14 , B23K26/1476 , B23K26/38 , B23K37/02 , B23K2101/06 , B23K2103/04 , E02B17/027 , E02B2017/0052 , E02D17/00 , E21B29/02
摘要: There is provided high power laser systems, high power laser tools, and methods of using these tools and systems for cutting, sectioning and removing structures objects, and materials, and in particular, for doing so in difficult to access locations and environments, such as offshore, underwater, or in hazardous environments, such as nuclear and chemical facilities. Thus, there is also provided high power laser systems, high power laser tools, and methods of using these systems and tools for removing structures, objects, and materials located offshore, under bodies of water and under the seafloor.
-
公开(公告)号:US09731379B2
公开(公告)日:2017-08-15
申请号:US14592134
申请日:2015-01-08
IPC分类号: B23K20/16 , B23K20/02 , B23K20/227 , B23K20/233 , B23K11/11 , B23K11/16 , B23K11/20 , B23K20/10 , B23K101/18 , B23K103/08 , B23K103/10 , B23K103/20 , B23K101/34 , B23K103/04 , B23K103/18
CPC分类号: B23K20/16 , B23K11/11 , B23K11/163 , B23K11/20 , B23K20/023 , B23K20/10 , B23K20/2275 , B23K20/233 , B23K20/2333 , B23K20/2336 , B23K2101/18 , B23K2101/34 , B23K2103/04 , B23K2103/08 , B23K2103/10 , B23K2103/15 , B23K2103/18 , B23K2103/20
摘要: Aluminum alloy workpieces and/or magnesium alloy workpieces are joined in a solid state weld by use of a reactive material placed, in a suitable form, at the joining surfaces. Joining surfaces of the workpieces are pressed against the interposed reactive material and heated. The reactive material alloys or reacts with the workpiece surfaces consuming some of the surface material in forming a reaction product comprising a low melting liquid that removes oxide films and other surface impediments to a welded bond across the interface. Further pressure is applied to expel the reaction product and to join the workpiece surfaces in a solid state weld bond.
-
公开(公告)号:US20170203638A1
公开(公告)日:2017-07-20
申请号:US15314689
申请日:2015-05-22
申请人: SHIROKI CORPORATION
发明人: Jun MAKITA , Yu OKUMURA , Hiroshi ENOKI
CPC分类号: B60J5/0402 , B23K2101/006 , B23K2101/185 , B23K2101/34 , B23K2103/04
摘要: An object is to provide a sash coupling structure and a method for sash coupling that ensures omission of the process. The sash coupling structure is made such that on a door frame constituted of a column and an upper sash, a coupling cross-sectional surface of the column and a coupling cross-sectional surface of the upper sash are butted together. The column is constituted of a channel member and an inner member. The channel member and the inner member include adhering portions coupled one another along a longitudinal direction. The inner member is plated. A non-adhering portion, which faces a non-not-yet-adhering portion of the inner member, is formed on the channel member at a butted coupling portion.
-
公开(公告)号:US09682443B2
公开(公告)日:2017-06-20
申请号:US14070132
申请日:2013-11-01
申请人: ArcelorMittal France
发明人: Jean-Francois Canourgues , Aurelien Pic , Pascal Verrier , Rene Vierstraete , Wolfram Ehling , Bernd Thommes
IPC分类号: B32B15/01 , B23K37/00 , B23K1/14 , B23K26/24 , B23K9/00 , C23C10/22 , B23K26/362 , B23K9/23 , B23K33/00 , C23C2/26 , C23C28/02 , B23K26/32 , B23K26/322 , B23K26/40 , C22C21/02 , C22C38/00 , C22C38/02 , C22C38/04 , C22C38/06 , C22C38/28 , C22C38/32 , C23C2/12 , B23K26/21 , B23K31/02 , C23C2/04 , B23K9/02 , B23K26/36 , C21D1/00 , C21D6/00 , C21D9/50 , B23K101/18 , B23K103/04 , B23K103/10 , B23K101/34 , B23K103/00
CPC分类号: B23K33/00 , B23K1/14 , B23K9/0026 , B23K9/02 , B23K9/025 , B23K9/23 , B23K10/02 , B23K26/21 , B23K26/24 , B23K26/26 , B23K26/32 , B23K26/322 , B23K26/36 , B23K26/362 , B23K26/40 , B23K31/02 , B23K37/003 , B23K2101/18 , B23K2101/34 , B23K2103/04 , B23K2103/08 , B23K2103/10 , B23K2103/50 , B32B15/012 , C21D1/00 , C21D6/002 , C21D6/005 , C21D6/008 , C21D9/50 , C21D2211/008 , C22C21/02 , C22C38/002 , C22C38/02 , C22C38/04 , C22C38/06 , C22C38/08 , C22C38/28 , C22C38/32 , C23C2/04 , C23C2/12 , C23C2/26 , C23C2/28 , C23C2/40 , C23C10/22 , C23C28/021 , F16B5/08 , Y10T428/12229 , Y10T428/12271 , Y10T428/12389 , Y10T428/12396 , Y10T428/12486 , Y10T428/12493 , Y10T428/12757 , Y10T428/12764 , Y10T428/12972 , Y10T428/12979 , Y10T428/2495 , Y10T428/24967 , Y10T428/24975 , Y10T428/26 , Y10T428/263 , Y10T428/264 , Y10T428/265
摘要: A plate is provided. The plate includes a steel substrate and a precoat having a layer of intermetallic alloy in contact with the substrate, topped by a layer of aluminum alloy. On at least one precoated face of the plate, an area situated at the periphery of the plate has the aluminum alloy layer removed. A part and a welded blank are also provided. Methods are also provided.
-
公开(公告)号:US09669490B2
公开(公告)日:2017-06-06
申请号:US14865721
申请日:2015-09-25
申请人: ArcelorMittal France
发明人: Jean-Francois Canourgues , Aurelien Pic , Pascal Verrier , Rene Vierstraete , Wolfram Ehling , Bernd Thommes
IPC分类号: B23K26/36 , B23K26/40 , B23K26/362 , B23K9/23 , B23K33/00 , B32B15/01 , C23C2/26 , C23C28/02 , B23K1/14 , B23K9/00 , B23K26/24 , B23K37/00 , C23C10/22 , B23K26/32 , B23K26/322 , C22C21/02 , C22C38/00 , C22C38/02 , C22C38/04 , C22C38/06 , C22C38/28 , C22C38/32 , C23C2/12 , B23K26/21 , B23K31/02 , C23C2/04 , B23K9/02 , C21D1/00 , C21D6/00 , C21D9/50 , B23K101/18 , B23K103/04 , B23K103/10 , B23K101/34 , B23K103/00
CPC分类号: B23K33/00 , B23K1/14 , B23K9/0026 , B23K9/02 , B23K9/025 , B23K9/23 , B23K10/02 , B23K26/21 , B23K26/24 , B23K26/26 , B23K26/32 , B23K26/322 , B23K26/36 , B23K26/362 , B23K26/40 , B23K31/02 , B23K37/003 , B23K2101/18 , B23K2101/34 , B23K2103/04 , B23K2103/08 , B23K2103/10 , B23K2103/50 , B32B15/012 , C21D1/00 , C21D6/002 , C21D6/005 , C21D6/008 , C21D9/50 , C21D2211/008 , C22C21/02 , C22C38/002 , C22C38/02 , C22C38/04 , C22C38/06 , C22C38/08 , C22C38/28 , C22C38/32 , C23C2/04 , C23C2/12 , C23C2/26 , C23C2/28 , C23C2/40 , C23C10/22 , C23C28/021 , F16B5/08 , Y10T428/12229 , Y10T428/12271 , Y10T428/12389 , Y10T428/12396 , Y10T428/12486 , Y10T428/12493 , Y10T428/12757 , Y10T428/12764 , Y10T428/12972 , Y10T428/12979 , Y10T428/2495 , Y10T428/24967 , Y10T428/24975 , Y10T428/26 , Y10T428/263 , Y10T428/264 , Y10T428/265
摘要: A method of fabricating a precoated steel plate, the method including coating a steel plate by dipping the steel plate in a molten bath to obtain a precoat upon the steel plate, wherein the precoat includes an intermetallic alloy layer and a metal alloy layer. The intermetallic alloy layer is topped by the metal alloy layer. On at least one face of the plate, the metal alloy layer is removed in an area at a periphery of the plate using a laser beam, while leaving at least part of the intermetallic alloy layer in the area. The at least part of the intermetallic layer in the area has a thickness between 3 and 10 micrometers thick.
-
公开(公告)号:US09669485B2
公开(公告)日:2017-06-06
申请号:US13974125
申请日:2013-08-23
CPC分类号: B23K9/235 , B23K9/173 , B23K9/23 , B23K35/286 , B23K35/302 , B23K35/383 , B23K2103/04 , C21D1/06 , C23C8/02 , C23C8/50 , C23C8/80
摘要: A method for producing a welded part from two components, where at least one of the components has a hardened surface. The method can include case hardening the surface of one of the components using a salt bath nitriding process and then welding the case hardened first component to the second component by gas metal arc welding (GMAW).
-
公开(公告)号:US20170129055A1
公开(公告)日:2017-05-11
申请号:US15319482
申请日:2015-06-16
申请人: BAE SYSTEMS plc
发明人: NORMAN COOPER
CPC分类号: B23K33/00 , B23K31/02 , B23K31/125 , B23K2103/04 , G01N33/20
摘要: A test method is provided to reproducibly test under matched HY100 welds to robustly establish the production parameters for the welding process. The test method comprises forming a ‘U’ shaped groove in a plate to which steel members are welded on the reverse side. The steel members comprise transverse members that extend across the weld. The transverse members are arranged at a density of at least four members for each 0.5 m length of weld and preferably five transverse members. The steel members further comprise longitudinal stiffeners that extend parallel to the weld. The longitudinal stiffeners are arranged at a density of two stiffeners per 0.4 m width of the plate. The high density of stiffeners has provided a reproducible and reliable weld test method that is capable of being used to establish and approve production parameters for the welding process of under matched HY100 welds.
-
公开(公告)号:US09644504B2
公开(公告)日:2017-05-09
申请号:US14660018
申请日:2015-03-17
申请人: Caterpillar Inc.
发明人: Mark Veliz , Mark Geissler
IPC分类号: F01L3/02 , F01L3/00 , F01L3/20 , B23K11/16 , B23K20/12 , B23K20/22 , C22C19/05 , B23K103/04 , B23K103/08 , B23K103/18
CPC分类号: F01L3/02 , B23K11/16 , B23K20/129 , B23K20/22 , B23K2103/04 , B23K2103/08 , B23K2103/18 , C22C19/057 , F01L3/00 , F01L3/20 , F01L2101/00
摘要: A valve for use in an internal combustion engine is disclosed. The valve includes a stem friction welded to a head portion. The head portion is cast from a single crystal metal using a casting process that creates little or no grain boundaries. The single crystal metal can be a nickel based superalloys such as CMSX-4, CMSX 3, Rene N5, and Rene N6. By having little or no grain boundaries, defects that occur in other types of casting material, such as large numbers of grain boundaries can be minimized. This allows the head portion and particularly the combustion face to withstand an operating temperature in the combustion chamber in excess of 850° C.
-
-
-
-
-
-
-
-
-